Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9461-9470 of 19014 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
994270Project ID: 994270
DEA: 072XC004
EFIS: 0723000026
07-LA,LA/LA-5-62.12/62.3, 61.5/64.3, R61.5R +R61.2L/R63.7R +R64.3L, R61.5R/R63.7RLA-5 Remove and replace fire timber lagging retaining wallI5N Near Castaic PM 62.12 and 62.311/07/20241 (09/19/2022)Details CEM-3701 Report
2069Project ID: 2069
DEA: 04262004
EFIS: 0400000724
04-SCL-880- I-880 and Coleman Avenue.05/07/2019NOT VERIFIEDDetails CEM-3701 Report
6389Project ID: 6389
MINOR: 11A1639
11-SD-805-12.9Re-stripe gore area to allow HOV access and revise wiring for EMSI-805 1 (11/01/2010)Details CEM-3701 Report
214114Project ID: 214114
DEA: 040A5394
EFIS: 0418000244
04-SOL-80,12-11.4/12.8, 2.1/2.8Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.I-80/I-680/Route 12 Interchange02/24/20231 (04/23/2019)Details CEM-3701 Report
6951Project ID: 6951
DEA: 043A7714
EFIS: 0400002038
Permit Numbers: 0409NMC1718
04-ALA--0/13.5Install traffic operation system (TOS) elements at various locations along the Interstate 80 (I-80) corridor from the Bay Bridge to the Carquinze Bridge.I-80, various09/14/20181 (05/14/2012)Details CEM-3701 Report
208573Project ID: 208573
Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031
04-CC-80-1.67/1.67This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd.i-80 Ramps at Potrero Ave., El Cerrito09/14/20181 (02/13/2013)Details CEM-3701 Report
993163Project ID: 993163
Permit Numbers: 0321AOP0723 0322ARD0813 0322ARD0815
03---13.1/-1Construct a single lane roundabout at the current stop controlled intersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)as per the attached plans and documents submitted to the Caltrans Encroachment Office.I-80 EB Ramps at Donner Pass Road, Truckee08/11/20231 (07/29/2021)Details CEM-3701 Report
790Project ID: 790
EFIS: 0000001155
Permit Numbers: 0309NSN0051 03096DP0495
03-PLA-80-13.8/13.8Signal-New / ModifyI-80 East bound Off-Ramp and Newcastle Road/Indian Hill Road, Newcastle09/17/2014NOT VERIFIEDDetails CEM-3701 Report
209760Project ID: 209760
DEA: 040G2514
EFIS: 0400020535
COOP: 042463
04-SF-80,280-NEW RAMPS & NEW TERMINAL TO RTE 80 BUS STORAGE FACILITYI-80 AND THE FREMONT STREET OFFRAMP STRUCTURE01/04/20182 (08/11/2014)Details CEM-3701 Report
6858Project ID: 6858
DEA: 043A7734
Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139
04-CC--0/5The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor.I-80 AND SR 123, Var08/16/20131 (12/21/2012)Details CEM-3701 Report