Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9451-9460 of 18865 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214114Project ID: 214114
DEA: 040A5394
EFIS: 0418000244
04-SOL-80,12-11.4/12.8, 2.1/2.8Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.I-80/I-680/Route 12 Interchange02/24/20231 (04/23/2019)Details CEM-3701 Report
6951Project ID: 6951
DEA: 043A7714
EFIS: 0400002038
Permit Numbers: 0409NMC1718
04-ALA--0/13.5Install traffic operation system (TOS) elements at various locations along the Interstate 80 (I-80) corridor from the Bay Bridge to the Carquinze Bridge.I-80, various09/14/20181 (05/14/2012)Details CEM-3701 Report
208573Project ID: 208573
Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031
04-CC-80-1.67/1.67This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd.i-80 Ramps at Potrero Ave., El Cerrito09/14/20181 (02/13/2013)Details CEM-3701 Report
993163Project ID: 993163
Permit Numbers: 0321AOP0723 0322ARD0813 0322ARD0815
03---13.1/-1Construct a single lane roundabout at the current stop controlled intersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)as per the attached plans and documents submitted to the Caltrans Encroachment Office.I-80 EB Ramps at Donner Pass Road, Truckee08/11/20231 (07/29/2021)Details CEM-3701 Report
790Project ID: 790
EFIS: 0000001155
Permit Numbers: 0309NSN0051 03096DP0495
03-PLA-80-13.8/13.8Signal-New / ModifyI-80 East bound Off-Ramp and Newcastle Road/Indian Hill Road, Newcastle09/17/2014NOT VERIFIEDDetails CEM-3701 Report
209760Project ID: 209760
DEA: 040G2514
EFIS: 0400020535
COOP: 042463
04-SF-80,280-NEW RAMPS & NEW TERMINAL TO RTE 80 BUS STORAGE FACILITYI-80 AND THE FREMONT STREET OFFRAMP STRUCTURE01/04/20182 (08/11/2014)Details CEM-3701 Report
6858Project ID: 6858
DEA: 043A7734
Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139
04-CC--0/5The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor.I-80 AND SR 123, Var08/16/20131 (12/21/2012)Details CEM-3701 Report
1542Project ID: 1542
EFIS: 0000001155
Permit Numbers: 0407NSN0389
04-ALA-80-3.642/3.642Traffic signal modificationsI-80 and Powell Street, Emeryville08/31/2018NOT VERIFIEDDetails CEM-3701 Report
213911Project ID: 213911
Permit Numbers: 11166RW0780
11-SD-8-0.77-0.87Install bus stop, modify street island and update accessible push buttons and signal head at I-8 exit 3 south bound ramp to Taylor Street.I-8 exit 3 south bound ramp to Taylor Street08/24/20211 (01/30/2019)Details CEM-3701 Report
3828Project ID: 3828
DEA: 07142344
07-LA-710-29.2/29.8I-710/Firestone Blvd. Interchange Reconstruction Phase II-City Proj# 264-STI-710/Firestone Interchange City of South Gate02/09/20121 (02/09/2012)Details CEM-3701 Report