Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9451-9460 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214114 | Project ID: 214114 DEA: 040A5394 EFIS: 0418000244 | 04-SOL-80,12-11.4/12.8, 2.1/2.8 | Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. | I-80/I-680/Route 12 Interchange | 02/24/2023 | 1 (04/23/2019) | Details CEM-3701 Report |
| 6951 | Project ID: 6951 DEA: 043A7714 EFIS: 0400002038 Permit Numbers: 0409NMC1718 | 04-ALA--0/13.5 | Install traffic operation system (TOS) elements at various locations along the Interstate 80 (I-80) corridor from the Bay Bridge to the Carquinze Bridge. | I-80, various | 09/14/2018 | 1 (05/14/2012) | Details CEM-3701 Report |
| 208573 | Project ID: 208573 Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031 | 04-CC-80-1.67/1.67 | This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd. | i-80 Ramps at Potrero Ave., El Cerrito | 09/14/2018 | 1 (02/13/2013) | Details CEM-3701 Report |
| 993163 | Project ID: 993163 Permit Numbers: 0321AOP0723 0322ARD0813 0322ARD0815 | 03---13.1/-1 | Construct a single lane roundabout at the current stop controlled intersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)as per the attached plans and documents submitted to the Caltrans Encroachment Office. | I-80 EB Ramps at Donner Pass Road, Truckee | 08/11/2023 | 1 (07/29/2021) | Details CEM-3701 Report |
| 790 | Project ID: 790 EFIS: 0000001155 Permit Numbers: 0309NSN0051 03096DP0495 | 03-PLA-80-13.8/13.8 | Signal-New / Modify | I-80 East bound Off-Ramp and Newcastle Road/Indian Hill Road, Newcastle | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 209760 | Project ID: 209760 DEA: 040G2514 EFIS: 0400020535 COOP: 042463 | 04-SF-80,280- | NEW RAMPS & NEW TERMINAL TO RTE 80 BUS STORAGE FACILITY | I-80 AND THE FREMONT STREET OFFRAMP STRUCTURE | 01/04/2018 | 2 (08/11/2014) | Details CEM-3701 Report |
| 6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
| 1542 | Project ID: 1542 EFIS: 0000001155 Permit Numbers: 0407NSN0389 | 04-ALA-80-3.642/3.642 | Traffic signal modifications | I-80 and Powell Street, Emeryville | 08/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 213911 | Project ID: 213911 Permit Numbers: 11166RW0780 | 11-SD-8-0.77-0.87 | Install bus stop, modify street island and update accessible push buttons and signal head at I-8 exit 3 south bound ramp to Taylor Street. | I-8 exit 3 south bound ramp to Taylor Street | 08/24/2021 | 1 (01/30/2019) | Details CEM-3701 Report |
| 3828 | Project ID: 3828 DEA: 07142344 | 07-LA-710-29.2/29.8 | I-710/Firestone Blvd. Interchange Reconstruction Phase II-City Proj# 264-ST | I-710/Firestone Interchange City of South Gate | 02/09/2012 | 1 (02/09/2012) | Details CEM-3701 Report |
