Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9441-9450 of 19014 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211531 | Project ID: 211531 DEA: 11425904 EFIS: 1116000109 | 11-SD-var,VAR-var, | remove and disponse hazard trees | 10/16/2017 | NOT VERIFIED | Details CEM-3701 Report | |
| 209806 | Project ID: 209806 Permit Numbers: 1212NMC0698 | 12-ORA-5-15.4/15.4 | Construct new curb, gutter, sidewalk, curb ramp and AC pavement, and perform traffic signal modification at I-5 NB off-Ramp to accommodate the widening of the Oso Parkway from I-5 FWY 0n-Ramp and Off-Ramp to Country Club Drive in the City of Mission Viejo, PM: 15.4.All performed work shall be in ac | Oso Parkway, Mission Viejo | 06/30/2015 | NOT VERIFIED | Details CEM-3701 Report |
| 209819 | Project ID: 209819 DEA: 11275504 EFIS: 1100000276 | 11-SD-67,880,680-R0.0/R5.9 | COLD PLANE, PLACE RHMA-G, CONCRETE BARRIER AND GUARDRAIL.; PAVEMENT REHABILITATION (RAMPS, MAIN LINE AND SHOULDERS) | SAN DIEGO COUNTY IN AND NEAR EL CAJON AND SANTEE FROM ROUTE 8/67 SEPARATION TO SAN DIEGO RIVER BRIDGE | 05/03/2017 | 1 (03/16/2015) | Details CEM-3701 Report |
| 209808 | Project ID: 209808 DEA: 024G3204 EFIS: 0213000101 MINOR: 02A1360 | 02-SHA-44-34 | Install Picnic Area Lighting | At Shingletown SRRA | 12/21/2020 | 1 (08/12/2014) | Details CEM-3701 Report |
| 209811 | Project ID: 209811 DEA: 042A9304 EFIS: 0400000847 COOP: 042272A2 | 04--- | Removal of non-native, invasive plant species and reintroduction of approved native plants | In the Fort Baker area of Golden Gate National Recreation Area (GGNRA) and in adjacent areas north of Waldo Tunnel extending to Rodeo Avenue along US Route 101 within Sausalito | 06/08/2020 | 1 (02/03/2020) | Details CEM-3701 Report |
| 209812 | Project ID: 209812 DEA: 04264H34 EFIS: 0414000221 COOP: 042535 | 04-MRN-101-18.6/27.7 | PHASE 1 OF MARIN -SONOMA NARROWS HIGH OCCUPANCY VEHICLE WIDENING PROJECT I | IN MARIN COUNTY IN NOVATO AND NEAR BURDELL AT VARIOUS LOCATIONS FROM SOUTH NOVATO BOULEVARD OVERCROSSINGTO 0.3 MILE NORTH OF REDWOOD LANDFILL OVERCROSSING | 12/22/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 210030 | Project ID: 210030 DEA: 060G9004 EFIS: 0600000112 COOP: 061592 | 06-MAD-41-11.7/13.4 | PASSING LANES | MADERA COUNTY | 04/19/2018 | 1 (07/21/2015) | Details CEM-3701 Report |
| 209815 | Project ID: 209815 EFIS: 1013000068 MINOR: 10A1630 | 10-ALP--Various | Replace Culvert and Install Cured in Place Pipeliner | For Construction in Alpine and Mariposa Counties | 12/06/2019 | 1 (07/22/2014) | Details CEM-3701 Report |
| 209816 | Project ID: 209816 EFIS: 1013000103 MINOR: 10A1645 | 10-ALP--VAR | RADIO COMMUNICATION INFRASTRUCTURE | CONSTRUCTION ON STATE HIGHWAY 4, 89, 108 IN ALPINE AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 12/06/2019 | 1 (07/22/2014) | Details CEM-3701 Report |
| 209818 | Project ID: 209818 DEA: 024F6304 EFIS: 0213000022 | 02-TRI-3-R26.2 | ROADWAY EXCAVATION, ROCK SLOPE PROTECTION AND HMA | TRINITY COUNTY ABOUT 10 MILES SOUTH OF DOUGLAS CITY AT 0.1 MILE SOUTH OF BROWNS CREEK BRIDGE | 03/15/2017 | 1 (12/05/2014) | Details CEM-3701 Report |
