Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9411-9420 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 790 | Project ID: 790 EFIS: 0000001155 Permit Numbers: 0309NSN0051 03096DP0495 | 03-PLA-80-13.8/13.8 | Signal-New / Modify | I-80 East bound Off-Ramp and Newcastle Road/Indian Hill Road, Newcastle | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 993163 | Project ID: 993163 Permit Numbers: 0321AOP0723 0322ARD0813 0322ARD0815 | 03---13.1/-1 | Construct a single lane roundabout at the current stop controlled intersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)as per the attached plans and documents submitted to the Caltrans Encroachment Office. | I-80 EB Ramps at Donner Pass Road, Truckee | 08/11/2023 | 1 (07/29/2021) | Details CEM-3701 Report |
| 208573 | Project ID: 208573 Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031 | 04-CC-80-1.67/1.67 | This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd. | i-80 Ramps at Potrero Ave., El Cerrito | 09/14/2018 | 1 (02/13/2013) | Details CEM-3701 Report |
| 6951 | Project ID: 6951 DEA: 043A7714 EFIS: 0400002038 Permit Numbers: 0409NMC1718 | 04-ALA--0/13.5 | Install traffic operation system (TOS) elements at various locations along the Interstate 80 (I-80) corridor from the Bay Bridge to the Carquinze Bridge. | I-80, various | 09/14/2018 | 1 (05/14/2012) | Details CEM-3701 Report |
| 214114 | Project ID: 214114 DEA: 040A5394 EFIS: 0418000244 | 04-SOL-80,12-11.4/12.8, 2.1/2.8 | Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. | I-80/I-680/Route 12 Interchange | 02/24/2023 | 1 (04/23/2019) | Details CEM-3701 Report |
| 6389 | Project ID: 6389 MINOR: 11A1639 | 11-SD-805-12.9 | Re-stripe gore area to allow HOV access and revise wiring for EMS | I-805 | 1 (11/01/2010) | Details CEM-3701 Report | |
| 2069 | Project ID: 2069 DEA: 04262004 EFIS: 0400000724 | 04-SCL-880- | I-880 and Coleman Avenue. | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report | |
| 994270 | Project ID: 994270 DEA: 072XC004 EFIS: 0723000026 | 07-LA,LA/LA-5-62.12/62.3, 61.5/64.3, R61.5R +R61.2L/R63.7R +R64.3L, R61.5R/R63.7R | LA-5 Remove and replace fire timber lagging retaining wall | I5N Near Castaic PM 62.12 and 62.3 | 11/07/2024 | 1 (09/19/2022) | Details CEM-3701 Report |
| 148 | Project ID: 148 DEA: 01461304 EFIS: 0100020082 MINOR: 01A1165 | 01-DN-199-28.1 | Construct Building and install water treatment system | Idle wind Maintenance Yard adjacent to Rte 199 near gas quest in Del Morte County | 01/24/2013 | 1 (01/24/2013) | Details CEM-3701 Report |
| 7745 | Project ID: 7745 EFIS: 0000001155 Permit Numbers: 0412NMC0500 | 04-NAP-121-5.5/5.5 | The work proposed under this permit involves re-striping and minor signal work associated with adding a second left turn at the intersection of Imola Avenue(SR 121)and Gasser Dr. for the eastbound Imola to northbound Gasser Movement. | Imola Ave. / Gasser Dr. Intersection, Napa | 09/14/2018 | 1 (09/17/2012) | Details CEM-3701 Report |