Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9401-9410 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6272 | Project ID: 6272 DEA: 112M1804 | 11-IMP-86-21.7/R37.3 | COLD PLANE, APPLY ASPHALT RUBBER SEAL COAT AND OVERLAY WITH HMA. | IMPERIAL COUNTY IN AND NEAR WESTMORLAND FROM BRANDT ROAD TO LONE TREE WASH BRIDGE | 12/24/2012 | 1 (05/26/2011) | Details CEM-3701 Report |
| 209329 | Project ID: 209329 DEA: 112M5104 EFIS: 1100020425 | 11-IMP-86-11.3/20.6 | REPLACE AC, PLACE ASPHALT RUBBER SEAL COAT, COLD PLANE AND OVERLAY. | IMPERIAL COUNTY IN AND NEAR IMPERIAL AND BRAWLEY FROM 15TH STREET TO SOUTH JUNCTION ROUTE 78. | 12/04/2015 | 1 (01/05/2016) | Details CEM-3701 Report |
| 215590 | Project ID: 215590 DEA: 112N0414 EFIS: 1118000184 | 11-IMP-115-R8.8/L11.4 | COLD PLANE, PAVE WITH HMA, PLACE MICROSURFACING AND SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM TOWLAND ROAD TO WEST JUNCTION EVAN HEWES HIGHWAY. | 05/10/2022 | 1 (07/23/2021) | Details CEM-3701 Report |
| 993611 | Project ID: 993611 DEA: 112N1154 EFIS: 1121000144 | 11-IMP-115-R3.2/R8.8,9.5/21.2 | ASPHALT RUBBER BINDER CHIP SEAL, PAVEMENT MARKINGS & SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM ROUTE 115/8 SEPARATION TO TOWLAND ROAD AND FROM WEST JUNCTION EVAN HEWES HIGHWAY TO EAST JUNCTION ROUTE 78/115 | 05/02/2023 | 1 (03/07/2022) | Details CEM-3701 Report |
| 210401 | Project ID: 210401 DEA: 112M7704 | 11-IMP-115-R8.5/21.2 | APPLY ASPHALT RUBBER BINDER SEAL COAT AND SLURRY SEAL. | IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM 0.2 MILE WEST OF BRIDENSTINE AVENUE TO EAST JUNCTION ROUTE 78 | 12/04/2015 | 1 (03/01/2016) | Details CEM-3701 Report |
| 210548 | Project ID: 210548 DEA: 112M7804 EFIS: 1114000092 | 11-IMP-8-R28.0/R40.9 | COLD PLANE AC, PAVE WITH HMA, PLACE ASPHALT RUBBER BINDER SEAL COAT. | IMPERIAL COUNTY IN AND NEAR EL CENTRO FROM 0.5 MILES EAST OF WESTSIDE ROAD OVERCROSSING TO ROUTE 8/111 SEPARATION | 08/07/2018 | 1 (08/26/2015) | Details CEM-3701 Report |
| 1001005 | Project ID: 1001005 DEA: 112N2304 EFIS: 1124000188 | 11-IMP-86-4.5/L8.5,20.4/R21.9 | MICRO-SURFACING, PAVEMENT MARKING, RUMBLE STRIP, AND SHOULDER BACKING. | IMPERIAL COUNTY IN AND NEAR EL CENTRO AND BRAWLEY FROM MCCABE ROAD TO IMPERIAL AVENUE AND FROM I STREET TO 0.3 MILE NORTH OF NEW RIVER BRIDGE | 1 (05/28/2025) | Details CEM-3701 Report | |
| 209381 | Project ID: 209381 DEA: 112M6604 EFIS: 1113000110 | 11-IMP-60,215-32.3/39.6 | OVERLAY WITH HMA (TYPE A) AND APPLY ASPHALT RUBBER SEAL COAT. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM ROUTE 111 TO ROUTE 7 | 11/25/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 1001058 | Project ID: 1001058 DEA: 112N2264 EFIS: 1124000122 | 11-IMP-98-30.0/R57.0 | PLACE RUMBLE STRIPS AND PAVEMENT DELINEATION. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM 2.3 MILES WEST OF ROUTE 111 TO EVAN HEWES HIGHWAY | 1 (06/03/2025) | Details CEM-3701 Report | |
| 8223 | Project ID: 8223 DEA: 11275204 EFIS: 1100020349 | 11-IMP-98-21.8/31.3 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED), MBGR AND CURB RAMPS. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM 0.2 MILE WEST OF WESTSIDE MAIN CANAL BRIDGE TO KLOKE ROAD | 07/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
