Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9401-9410 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209150 | Project ID: 209150 DEA: 041G0904 EFIS: 0400021005 Permit Numbers: 0412NMC1591 | 04-ALA-580-R21.43 | Ramp Reconfiguration | I-580 EB Off Ramp at Foothill Road/San Ramon Road | 05/07/2019 | 2 (11/12/2013) | Details CEM-3701 Report |
| 214574 | Project ID: 214574 Permit Numbers: 0419NSN1668 0420NRT0247 04206DP0165 0419NSN1668 | 04-CC-680-2.89 | Restriping and signal modification.perform traffic control, remove existing stripe marking; install new striping by converting number 3 lane from shared through/right lane to a through lane only; install surface-mounted channelizers between lane 2 and 3 on westbound Bollinger Canyon Road; and insta | i-680 at Bollinger Canyon Road Interchange, San Ramon | 04/27/2023 | 1 (12/10/2019) | Details CEM-3701 Report |
| 993515 | Project ID: 993515 DEA: 040Q9504 EFIS: 0418000187 | 04-CC-680-R0.0/14.42 | Improve highway system | I-680 between Ygnacio Valley Road and Alcosta Boulevard in Contra Costa County | 2 (10/03/2022) | Details CEM-3701 Report | |
| 994423 | Project ID: 994423 DEA: 04229144 EFIS: 0420000156 COOP: 043048 | 04-CC-I-680,SR-4-20.2 / 22.2 | I-680/SR 4 Interchange Improvements | I-680/SR 4 | 2 (05/09/2023) | Details CEM-3701 Report | |
| 1000449 | Project ID: 1000449 DEA: 07372104 EFIS: 0720000156 Permit Numbers: 0723NOP2197 | 07-LA-LA-710-5.8 | Construction of retaining wall | I-710 at Pier B St, Long Beach | 2 (07/18/2024) | Details CEM-3701 Report | |
| 3828 | Project ID: 3828 DEA: 07142344 | 07-LA-710-29.2/29.8 | I-710/Firestone Blvd. Interchange Reconstruction Phase II-City Proj# 264-ST | I-710/Firestone Interchange City of South Gate | 02/09/2012 | 1 (02/09/2012) | Details CEM-3701 Report |
| 213911 | Project ID: 213911 Permit Numbers: 11166RW0780 | 11-SD-8-0.77-0.87 | Install bus stop, modify street island and update accessible push buttons and signal head at I-8 exit 3 south bound ramp to Taylor Street. | I-8 exit 3 south bound ramp to Taylor Street | 08/24/2021 | 1 (01/30/2019) | Details CEM-3701 Report |
| 1542 | Project ID: 1542 EFIS: 0000001155 Permit Numbers: 0407NSN0389 | 04-ALA-80-3.642/3.642 | Traffic signal modifications | I-80 and Powell Street, Emeryville | 08/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6858 | Project ID: 6858 DEA: 043A7734 Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139 | 04-CC--0/5 | The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor. | I-80 AND SR 123, Var | 08/16/2013 | 1 (12/21/2012) | Details CEM-3701 Report |
| 209760 | Project ID: 209760 DEA: 040G2514 EFIS: 0400020535 COOP: 042463 | 04-SF-80,280- | NEW RAMPS & NEW TERMINAL TO RTE 80 BUS STORAGE FACILITY | I-80 AND THE FREMONT STREET OFFRAMP STRUCTURE | 01/04/2018 | 2 (08/11/2014) | Details CEM-3701 Report |
