Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9391-9400 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001099 | Project ID: 1001099 DEA: 112N1784 EFIS: 1123000070 | 11-IMP-8-R0.0R/R10.3 | MICRO-SURFACING, COLD PLANE AC PAVEMENT, PLACE HMA, AND STRIPING. | IMPERIAL COUNTY FROM IMPERIAL COUNTY LINE (R0.0R) TO 98/8 FLYOVER (R10.3) AND 98/8 INTERCHANGE | 1 (05/30/2025) | Details CEM-3701 Report | |
| 994103 | Project ID: 994103 DEA: 114C0014 EFIS: 1122000095 | 11-IMP-7-0.1/0.5 | INSTALL ARTWORK MONUMENT AND PLACE GRAVEL MULCH. | IMPERIAL COUNTY EAST OF CALEXICO FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF VEHICLE SEPARATION / ROUTE 7 SPUR | 1 (08/23/2022) | Details CEM-3701 Report | |
| 215589 | Project ID: 215589 DEA: 112N0084 EFIS: 1117000153 | 11-IMP-7,8,78,86,98,111-Var | METHACRYLATE BRIDGE DECKS, REPAIR SPALLS AND REPLACE JOINT SEALS. | IMPERIAL COUNTY AT VARIOUS LOCATIONS. | 09/14/2023 | 1 (07/06/2021) | Details CEM-3701 Report |
| 1000187 | Project ID: 1000187 DEA: 112N1674 EFIS: 1122000280 | 11-IMP-86-R34.8/64.1 | POLYESTER CONCRETE OVERLAY, APPLY METHACRYLATE,& JOINT SEALS. | IMPERIAL COUNTY AT VARIOUS LOCATIONS FROM TRIFOLIUM CANAL BRIDGE (58-0017) TO GODETIA DITCH BRIDGE (58-0067) | 06/09/2025 | 1 (06/11/2024) | Details CEM-3701 Report |
| 7264 | Project ID: 7264 DEA: 112M2304 EFIS: 1100020039 | 11-IMP-8-R41.0/R96.0 | INDIVIDUAL SLAB REPLACEMENT WITH RAPID STRENGTH CONCRETE. | IMPERIAL COUNTY AT VARIOUS LOCATIONS FROM ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF 4TH AVENUE OVERCORSSING | 05/29/2013 | 1 (08/20/2012) | Details CEM-3701 Report |
| 994615 | Project ID: 994615 DEA: 112N1644 EFIS: 1122000151 | 11-IMP-8-R3.7/R48.0 | MICROSURFACING, COLD PLANE, RHMA, PAVEMENT MARKING, & CENSUS SYSTEMS. | IMPERIAL COUNTY AT VARIOUS LOCATIONS FROM 0.7 MILE EAST OF MOUNTAIN SPRINGS ROAD UNDERCROSSING TO 0.2 MILE EAST OF ROUTE 7/8 SEPARATION | 06/11/2024 | 1 (06/04/2024) | Details CEM-3701 Report |
| 995065 | Project ID: 995065 DEA: 112N1764 | 11-IMP-8-R50.3/R96.7 | MICROSURFACING, SHOULDER BACKING, PAVEMENT MARKING, & INSTALL SIGNS. | IMPERIAL COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF BONDS CORNER OVERCROSSING TO 0.2 MILE EAST OF FOURTH AVENUE OVERCROSSING . | 1 (06/11/2024) | Details CEM-3701 Report | |
| 6255 | Project ID: 6255 DEA: 112M0004 | 11-IMP-8,86,111,115-Var | Clean and treat bridge deck with methacrylate and replace joint seals. | IMPERIAL COUNTY AT VARIOUS LOCATIONS | 10/12/2010 | 1 (01/03/2011) | Details CEM-3701 Report |
| 7185 | Project ID: 7185 DEA: 112M3104 EFIS: 1100020269 | 11-IMP-8,86,111-Var | CLEAN AND TREAT BRIDGE DECKS WITH METHACRYLATE AND REPAIR JOINT SEALS. | IMPERIAL COUNTY AT VARIOUS LOCATIONS | 02/22/2013 | 1 (04/16/2012) | Details CEM-3701 Report |
| 7265 | Project ID: 7265 DEA: 112M2504 EFIS: 1100000754 | 11-IMP-8,111-Var | REPAIR BRIDGE COLUMN SPALLS AND REPLACE BEARING PAD. | IMPERIAL COUNTY AT VARIOUS LOCATIONS | 02/07/2013 | 1 (07/19/2012) | Details CEM-3701 Report |
