Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9381-9390 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993611Project ID: 993611
DEA: 112N1154
EFIS: 1121000144
11-IMP-115-R3.2/R8.8,9.5/21.2ASPHALT RUBBER BINDER CHIP SEAL, PAVEMENT MARKINGS & SHOULDER BACKING.IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM ROUTE 115/8 SEPARATION TO TOWLAND ROAD AND FROM WEST JUNCTION EVAN HEWES HIGHWAY TO EAST JUNCTION ROUTE 78/11505/02/20231 (03/07/2022)Details CEM-3701 Report
210401Project ID: 210401
DEA: 112M7704
11-IMP-115-R8.5/21.2APPLY ASPHALT RUBBER BINDER SEAL COAT AND SLURRY SEAL.IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM 0.2 MILE WEST OF BRIDENSTINE AVENUE TO EAST JUNCTION ROUTE 7812/04/20151 (03/01/2016)Details CEM-3701 Report
210548Project ID: 210548
DEA: 112M7804
EFIS: 1114000092
11-IMP-8-R28.0/R40.9COLD PLANE AC, PAVE WITH HMA, PLACE ASPHALT RUBBER BINDER SEAL COAT.IMPERIAL COUNTY IN AND NEAR EL CENTRO FROM 0.5 MILES EAST OF WESTSIDE ROAD OVERCROSSING TO ROUTE 8/111 SEPARATION08/07/20181 (08/26/2015)Details CEM-3701 Report
1001005Project ID: 1001005
DEA: 112N2304
EFIS: 1124000188
11-IMP-86-4.5/L8.5,20.4/R21.9MICRO-SURFACING, PAVEMENT MARKING, RUMBLE STRIP, AND SHOULDER BACKING.IMPERIAL COUNTY IN AND NEAR EL CENTRO AND BRAWLEY FROM MCCABE ROAD TO IMPERIAL AVENUE AND FROM I STREET TO 0.3 MILE NORTH OF NEW RIVER BRIDGE 1 (05/28/2025)Details CEM-3701 Report
209381Project ID: 209381
DEA: 112M6604
EFIS: 1113000110
11-IMP-60,215-32.3/39.6OVERLAY WITH HMA (TYPE A) AND APPLY ASPHALT RUBBER SEAL COAT.IMPERIAL COUNTY IN AND NEAR CALEXICO FROM ROUTE 111 TO ROUTE 711/25/2014NOT VERIFIEDDetails CEM-3701 Report
1001058Project ID: 1001058
DEA: 112N2264
EFIS: 1124000122
11-IMP-98-30.0/R57.0PLACE RUMBLE STRIPS AND PAVEMENT DELINEATION.IMPERIAL COUNTY IN AND NEAR CALEXICO FROM 2.3 MILES WEST OF ROUTE 111 TO EVAN HEWES HIGHWAY 1 (06/03/2025)Details CEM-3701 Report
8223Project ID: 8223
DEA: 11275204
EFIS: 1100020349
11-IMP-98-21.8/31.3PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED), MBGR AND CURB RAMPS.IMPERIAL COUNTY IN AND NEAR CALEXICO FROM 0.2 MILE WEST OF WESTSIDE MAIN CANAL BRIDGE TO KLOKE ROAD07/24/2014NOT VERIFIEDDetails CEM-3701 Report
209717Project ID: 209717
DEA: 11404404
EFIS: 1100020352
11-IMP-78,111-R9.2/R14.0,23.5/23.8INSTALL SLOPE PAVING, HIGHWAY PLANTING AND IRRIGATION SYSTEMS.IMPERIAL COUNTY IN AND NEAR BRAWLEY ON ROUTE 78 AT VARIOUS LOCATIONS FROM ROUTE 86 TO 0.1 MILE EAST OF BEST ROAD AND ON OLD ROUTE 111 FROM 0.2 MILE SOUTH TO 0.1 MILE NORTH OF ROUTE 78/111 SEPARATION08/16/20211 (10/29/2014)Details CEM-3701 Report
213123Project ID: 213123
DEA: 112N0134
EFIS: 1117000158
11-IMP-86-20.4/21.8,R27.0/28.0MILL AND REPLACE WITH SAMI AND RHMA, CONSTRUCT SIDEWALK AND BUS PADSIMPERIAL COUNTY IN AND NEAR BRAWLEY AND WESTMORLAND FROM I STREET TO BRANDT ROAD AND FROM 0.2 MILE SOUTH OF B STREET TO MARTIN ROAD12/17/20191 (05/30/2018)Details CEM-3701 Report
210534Project ID: 210534
DEA: 112M7404
11-IMP-88,12-23.9/40.5PLACE ASPHALT RUBBER BINDER SEAL COAT, CONSTRUCT RUMBLE STRIPS.IMPERIAL COUNTY IN AND NEAR BRAWLEY AND CALIPATRIA FROM NEW RIVER BRIDGE TO MAIN STREET01/15/20161 (03/01/2016)Details CEM-3701 Report