Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9361-9370 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7628 | Project ID: 7628 DEA: 120K5604 EFIS: 1200000357 Permit Numbers: 1212NMC0130 12126DP0172 12126DP0172 | 12-ORA-90-7.27 | Perform street improvements on Imperial Highway (SR-90) and Valencia Avenue (SR-142) in the city of Brea. Work will include pavement construction, traffic signal installation, signing & striping and median landscape improvements | Imperial Hwy, Brea | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 215159 | Project ID: 215159 Permit Numbers: 1220NMC0420 | 12---4.011 | Construct a right turn lane on Westbound Imperial Highway (SR-90) at Berry street Intersection.Work includes excavation, grading, traffic signal modification, drainage inlet relocation, retrofit of planting & irrigation and signing & striping within Caltrans Right-of-Way on Imperial Hwy at | Imperial Hwy, Brea | 1 (09/04/2020) | Details CEM-3701 Report | |
| 6475 | Project ID: 6475 EFIS: 0000001155 Permit Numbers: 1209NMC0357 | 12-ORA-90-5.625/5.8125 | improve the intersection capacity at the Associated Road intersection as part of the Imperial Highway (SR-90) Smart Street Project (Segment D).Improvements within the State right of way will include but not limited to: drainage and traffic signal modification | imperial highway, Brea | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 213082 | Project ID: 213082 DEA: 112N0104 EFIS: 1117000155 | 11-IMP-98,111-32.4/35.7,r1.2/r8.3 | PLACE STRESS ABSORBING MEMBRANE INTERLAYER AND OVERLAY WITH RHMA | IMPERIAL COUNTY, IN AND NEAR CALEXICO ON STATE ROUTE 111 FROM ROUTE 98 TO ROSS AVENUE AND ON ROUTE 98 FROM ROCKWOOD AVENUE TO 0.4 MILE EAST OF COLE ROAD | 12/31/2019 | 1 (04/23/2018) | Details CEM-3701 Report |
| 993401 | Project ID: 993401 DEA: 11430494 EFIS: 1118000262 | 11-IMP-8-R96.8 | REHABILITATE BRIDGE DECK, SLABS, BEARING PADS, JOINT SEALS & OVERLAY. | IMPERIAL COUNTY NEAR WINTERHAVEN AT COLORADO RIVER VIADUCT BRIDGE NO. 58-0312 L/R | 02/28/2024 | 1 (11/30/2021) | Details CEM-3701 Report |
| 6261 | Project ID: 6261 DEA: 112M0604 | 11-IMP-8-96.9 | Paint Bridge Structure. | IMPERIAL COUNTY NEAR WINTERHAVEN AT COLORADO RIVER BRIDGE | 03/25/2011 | 1 (10/26/2011) | Details CEM-3701 Report |
| 209973 | Project ID: 209973 DEA: 112M4604 EFIS: 1100020426 | 11-IMP-86-R21.9/43.1 | GRIND EXISTING PCC, REPLACE PCC SLABS AND PLACE JOINT SEAL. | IMPERIAL COUNTY NEAR WESTMORLAND FROM 0.1 MILE NORTH OF BRANDT ROAD TO 0.2 MILE SOUTH OF SAN FELIPE CREEK BRIDGE | 06/02/2015 | 1 (02/02/2015) | Details CEM-3701 Report |
| 7506 | Project ID: 7506 DEA: 11289604 EFIS: 1100000356 | 11-IMP-86,111-60.5,44.7 | ROCK SLOPE PROTECTION FOR SCOUR MITIGATION. | IMPERIAL COUNTY NEAR SALTON SEA BEACH AND NILAND ON ROUTE 86 AT TESLA WASH BRIDGE AND ON ROUTE 111 AT Z DRAIN BRIDGE | 06/11/2021 | 1 (07/30/2012) | Details CEM-3701 Report |
| 1001003 | Project ID: 1001003 DEA: 112N1474 EFIS: 1122000068 | 11-IMP-111-50.7,52.5 | REPAIR TWO CULVERTS. | IMPERIAL COUNTY NEAR SALTON SEA AT CLAY WASH AND AT FRINK WASH | 1 (05/02/2025) | Details CEM-3701 Report | |
| 1001128 | Project ID: 1001128 DEA: 112N2284 EFIS: 1124000186 | 11-IMP-78-0.0/13.2 | PLACE MICRO-SURFACING, RUMBLE STRIP, AND PAVEMENT DELINEATION. | IMPERIAL COUNTY NEAR OCOTILLO WELLS FROM SAN DIEGO COUNTY LINE TO NORTH JUNCTION ROUTE 86 | 1 (06/02/2025) | Details CEM-3701 Report |
