Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9351-9360 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6090 | Project ID: 6090 DEA: 11264004 | 11-IMP-8-R4.9,R7.2 | BRIDGE REHABILITATION WITH SEISMIC RETROFIT | IMPERIAL COUNTY NEAR OCOTILLO AT DEVIL'S CANYON BRIDGE NUMBER 2 AND AT MYER CREEK BRIDGE (58-0270 OR) | 06/05/2014 | 1 (08/22/2012) | Details CEM-3701 Report |
| 209504 | Project ID: 209504 DEA: 112M4404 EFIS: 1100020476 | 11-IMP-111-40.5/65.4 | OVERLAY WITH HMA (TYPE A) AND PLACE ASPHALT RUBBER SEAL COAT. | IMPERIAL COUNTY NEAR NILAND FROM MAIN STREET TO IMPERIAL COUNTY LINE | 07/07/2015 | 1 (01/13/2016) | Details CEM-3701 Report |
| 6275 | Project ID: 6275 DEA: 112M2704 EFIS: 1100020032 | 11-IMP-111-40.5/63.00 | ASPHALT RUBBERIZED SEAL COAT, PROFILE GRIND EXISTING PAVEMENT. | IMPERIAL COUNTY NEAR NILAND FROM MAIN STREET TO 2.4 MILES SOUTH OF IMPERIAL COUNTY LINE. | 06/12/2012 | 1 (06/18/2012) | Details CEM-3701 Report |
| 212145 | Project ID: 212145 DEA: 112M9404 EFIS: 1116000114 | 11-IMP-115-R3.2/R8.5,21.1/35.3 | APPLY ASPHALT RUBBER BINDER SEAL COAT, SLURRY SEAL, SHOULDER BACKING. | IMPERIAL COUNTY NEAR HOLTVILLE FROM ROUTE 115/8 SEPARATION TO 0.8 MILE SOUTH OF GRAPE AVENUE AND FROM WEST JUNCTION ROUTE 78/115 TO JUNCTION ROUTE 111/115 IN CALIPATRIA | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 6144 | Project ID: 6144 DEA: 11278004 COOP: 4922A1 | 11-IMP-78-41.1/63.0 | Apply asphalt-rubber and polymer modified seal coats. | IMPERIAL COUNTY NEAR GLAMIS FROM UNION PACIFIC RAILROAD CROSSING TO 0.5 MILE EAST OF MIDWAY WELLS ROAD | 02/23/2011 | 1 (10/26/2011) | Details CEM-3701 Report |
| 211878 | Project ID: 211878 DEA: 11418514 EFIS: 1115000139 | 11-IMP-8-R40.4/R45.5,R55.0/65.0 | CONSTRUCT CRCP OVERLAY, HMA-A, AND LIGHTING. | IMPERIAL COUNTY NEAR EL CENTRO FROM 0.5 MILE WEST OF ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF ANDERHOLT ROAD OVERCROSSING AND FROM 0.5 MILE EAST OF EAST HIGHLINE CANAL BRIDGE TO 0.8 MILE WEST OF EAST JUNCTION ROUTE 98/8 SEPERATION | 01/14/2021 | 1 (06/05/2017) | Details CEM-3701 Report |
| 6083 | Project ID: 6083 DEA: 11261514 | 11-IMP-8-R31.3 | Install sewage treatment system. | IMPERIAL COUNTY NEAR EL CENTRO AT SUNBEAM REST AREAS (EASTBOUND AND WESTBOUND) | 05/03/2012 | 1 (05/08/2012) | Details CEM-3701 Report |
| 6084 | Project ID: 6084 DEA: 11261524 | 11-IMP-8-R31.3 | UPGRADE THE RECREATIONAL VEHICLE DUMP STATION WASTE TREATMENT SYSTEMS. | IMPERIAL COUNTY NEAR EL CENTRO AT SUNBEAM REST AREA | 02/20/2013 | 1 (05/16/2011) | Details CEM-3701 Report |
| 214533 | Project ID: 214533 DEA: 11430524 EFIS: 1119000009 | 11-IMP-98-39.6/45.2 | COLD IN-PLACE RECYCLING, PLACE RHMA, SHOULDER BACKING & RUMBLE STRIP. | IMPERIAL COUNTY NEAR CALEXICO FROM ROUTE 7 TO 0.1 MILE WEST OF EAST HIGHLINE CANAL BRIDGE. | 10/08/2020 | 1 (02/11/2020) | Details CEM-3701 Report |
| 210848 | Project ID: 210848 DEA: 11398804 EFIS: 1115000119 MINOR: 11A2363 | 11-IMP-78-R11.8 | INSTALL SIGNAL AND STRIPING | IMPERIAL COUNTY NEAR BRAWLEY ON SR-78 FROM 0.2 MILE WEST OF HOVLEY ROAD TO 0.2 MILE EAST OF HOVLEY ROAD | 1 (09/30/2015) | Details CEM-3701 Report |
