Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9341-9350 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6475 | Project ID: 6475 EFIS: 0000001155 Permit Numbers: 1209NMC0357 | 12-ORA-90-5.625/5.8125 | improve the intersection capacity at the Associated Road intersection as part of the Imperial Highway (SR-90) Smart Street Project (Segment D).Improvements within the State right of way will include but not limited to: drainage and traffic signal modification | imperial highway, Brea | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 213082 | Project ID: 213082 DEA: 112N0104 EFIS: 1117000155 | 11-IMP-98,111-32.4/35.7,r1.2/r8.3 | PLACE STRESS ABSORBING MEMBRANE INTERLAYER AND OVERLAY WITH RHMA | IMPERIAL COUNTY, IN AND NEAR CALEXICO ON STATE ROUTE 111 FROM ROUTE 98 TO ROSS AVENUE AND ON ROUTE 98 FROM ROCKWOOD AVENUE TO 0.4 MILE EAST OF COLE ROAD | 12/31/2019 | 1 (04/23/2018) | Details CEM-3701 Report |
| 993401 | Project ID: 993401 DEA: 11430494 EFIS: 1118000262 | 11-IMP-8-R96.8 | REHABILITATE BRIDGE DECK, SLABS, BEARING PADS, JOINT SEALS & OVERLAY. | IMPERIAL COUNTY NEAR WINTERHAVEN AT COLORADO RIVER VIADUCT BRIDGE NO. 58-0312 L/R | 02/28/2024 | 1 (11/30/2021) | Details CEM-3701 Report |
| 6261 | Project ID: 6261 DEA: 112M0604 | 11-IMP-8-96.9 | Paint Bridge Structure. | IMPERIAL COUNTY NEAR WINTERHAVEN AT COLORADO RIVER BRIDGE | 03/25/2011 | 1 (10/26/2011) | Details CEM-3701 Report |
| 209973 | Project ID: 209973 DEA: 112M4604 EFIS: 1100020426 | 11-IMP-86-R21.9/43.1 | GRIND EXISTING PCC, REPLACE PCC SLABS AND PLACE JOINT SEAL. | IMPERIAL COUNTY NEAR WESTMORLAND FROM 0.1 MILE NORTH OF BRANDT ROAD TO 0.2 MILE SOUTH OF SAN FELIPE CREEK BRIDGE | 06/02/2015 | 1 (02/02/2015) | Details CEM-3701 Report |
| 7506 | Project ID: 7506 DEA: 11289604 EFIS: 1100000356 | 11-IMP-86,111-60.5,44.7 | ROCK SLOPE PROTECTION FOR SCOUR MITIGATION. | IMPERIAL COUNTY NEAR SALTON SEA BEACH AND NILAND ON ROUTE 86 AT TESLA WASH BRIDGE AND ON ROUTE 111 AT Z DRAIN BRIDGE | 06/11/2021 | 1 (07/30/2012) | Details CEM-3701 Report |
| 1001003 | Project ID: 1001003 DEA: 112N1474 EFIS: 1122000068 | 11-IMP-111-50.7,52.5 | REPAIR TWO CULVERTS. | IMPERIAL COUNTY NEAR SALTON SEA AT CLAY WASH AND AT FRINK WASH | 1 (05/02/2025) | Details CEM-3701 Report | |
| 1001128 | Project ID: 1001128 DEA: 112N2284 EFIS: 1124000186 | 11-IMP-78-0.0/13.2 | PLACE MICRO-SURFACING, RUMBLE STRIP, AND PAVEMENT DELINEATION. | IMPERIAL COUNTY NEAR OCOTILLO WELLS FROM SAN DIEGO COUNTY LINE TO NORTH JUNCTION ROUTE 86 | 1 (06/02/2025) | Details CEM-3701 Report | |
| 6265 | Project ID: 6265 DEA: 112M1004 | 11-IMP-8-R10.0/R28.0 | Apply Asphalt Rubber Seal Coat. | IMPERIAL COUNTY NEAR OCOTILLO FROM 0.3 MILE WEST OF ROUTE 98/8 SEPARATION TO 0.9 MILE WEST OF DERRICK ROAD OVERCROSSING | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 6377 | Project ID: 6377 DEA: 11402704 | 11-IMP-8-R7.4/R7.9 | REPLACE METAL BEAM GUARD RAILING WITH CONCRETE BARRIER. | IMPERIAL COUNTY NEAR OCOTILLO FROM 0.2 MILE EAST TO 0.7 MILE EAST OF MYER CREEK BRIDGE NUMBER 58-0270R | 11/08/2011 | 1 (12/27/2011) | Details CEM-3701 Report |
