Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9331-9340 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213177 | Project ID: 213177 DEA: 11425704 EFIS: 1116000118 Permit Numbers: 1118NOP0060 1118NRD0366 | 11---33.9/34.4 | enter upon State Highway right of way in San Diego County, City of San Diego, on Route 5, post mile R33.9 to R34.4 to perform highway improvements, as shown on the attached plans, pursuant to the requirements and conditions contained in the Highway Improvement Agreement listed above, pursuant to th | I-5, SAN DIEGO | 2 (08/18/2021) | Details CEM-3701 Report | |
| 1000073 | Project ID: 1000073 DEA: 120N3704 EFIS: 1214000005 COOP: 12820 | 12-ORA-I-5-R25.0 | Construct Class I bicycle and pedestrian bridge/trail connection of the Jeffrey Open Space Trail (JOST) across I-5. | I-5/Jeffrey Road Interchange | 2 (01/23/2024) | Details CEM-3701 Report | |
| 2065 | Project ID: 2065 DEA: 04257604 Permit Numbers: 0407NMC2109 0408NDP0819 0408NRW1001 | 04-ALA-580-26.0/27.4 | I-580 FALLON ROAD INTERCHANGE IMPROVEMENTS | I-580 at Fallon Road in the City of Dublin | 06/08/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 209150 | Project ID: 209150 DEA: 041G0904 EFIS: 0400021005 Permit Numbers: 0412NMC1591 | 04-ALA-580-R21.43 | Ramp Reconfiguration | I-580 EB Off Ramp at Foothill Road/San Ramon Road | 05/07/2019 | 2 (11/12/2013) | Details CEM-3701 Report |
| 214574 | Project ID: 214574 Permit Numbers: 0419NSN1668 0420NRT0247 04206DP0165 0419NSN1668 | 04-CC-680-2.89 | Restriping and signal modification.perform traffic control, remove existing stripe marking; install new striping by converting number 3 lane from shared through/right lane to a through lane only; install surface-mounted channelizers between lane 2 and 3 on westbound Bollinger Canyon Road; and insta | i-680 at Bollinger Canyon Road Interchange, San Ramon | 04/27/2023 | 1 (12/10/2019) | Details CEM-3701 Report |
| 993515 | Project ID: 993515 DEA: 040Q9504 EFIS: 0418000187 | 04-CC-680-R0.0/14.42 | Improve highway system | I-680 between Ygnacio Valley Road and Alcosta Boulevard in Contra Costa County | 2 (10/03/2022) | Details CEM-3701 Report | |
| 994423 | Project ID: 994423 DEA: 04229144 EFIS: 0420000156 COOP: 042818 | 04-CC-I-680,SR-4-20.2 / 22.2 | I-680/SR 4 Interchange Improvements | I-680/SR 4 | 2 (05/09/2023) | Details CEM-3701 Report | |
| 1000449 | Project ID: 1000449 DEA: 07372104 EFIS: 0720000156 Permit Numbers: 0723NOP2197 | 07-LA-LA-710-5.8 | Construction of retaining wall | I-710 at Pier B St, Long Beach | 2 (07/18/2024) | Details CEM-3701 Report | |
| 3828 | Project ID: 3828 DEA: 07142344 | 07-LA-710-29.2/29.8 | I-710/Firestone Blvd. Interchange Reconstruction Phase II-City Proj# 264-ST | I-710/Firestone Interchange City of South Gate | 02/09/2012 | 1 (02/09/2012) | Details CEM-3701 Report |
| 213911 | Project ID: 213911 Permit Numbers: 11166RW0780 | 11-SD-8-0.77-0.87 | Install bus stop, modify street island and update accessible push buttons and signal head at I-8 exit 3 south bound ramp to Taylor Street. | I-8 exit 3 south bound ramp to Taylor Street | 08/24/2021 | 1 (01/30/2019) | Details CEM-3701 Report |
