Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9301-9310 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212354 | Project ID: 212354 DEA: 044K8504 EFIS: 0417000378 | 04-MRN,MTRN-1-22.8, 22.80 | Giacomini Creek Bridge, Construct sheet pile wall, replace culvert | ROUTE 1, AT POSTMILE 22.8, NEAR BOLINAS, AT 0.52 MILES NORTH OF HORSESHOE HILL RD., MARIN COUNTY SLIPOUT, CONSTRUCT SOLDIER PILE WALL | 12/16/2021 | 1 (05/01/2017) | Details CEM-3701 Report |
| 212355 | Project ID: 212355 DEA: 044K7904 EFIS: 0417000348 | 04-SCL-101-52.2, 52.20 | Replace reinforced concrete girder | 12/21/2017 | 1 (06/22/2017) | Details CEM-3701 Report | |
| 212356 | Project ID: 212356 DEA: 044K7604 EFIS: 0417000349 | 04-ALA-84-22.2/22.5 | Construct RSP, erosion control, repair PCC drainage ditch | 08/08/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 212358 | Project ID: 212358 DEA: 010A4604 EFIS: 0113000025 | 01-LAK,HUM,MEN-29,101,128,254-var | BRIDGE REHAB - SCOUR | MENDOCINO AND HUMBOLDT COUNTIES AT VARIOUS LOCATIONS | 08/27/2018 | 1 (07/05/2017) | Details CEM-3701 Report |
| 212359 | Project ID: 212359 DEA: 010A4704 EFIS: 0113000026 | 01-LAK,MEN-1,101,162,175,253-VAR | BRIDGE FOUNDATION SCOUR REPAIR WITH RSP | MENDOCINO AND LAKE COUNTIES AT VARIOUS LOCATIONS | 01/07/2019 | 1 (08/15/2017) | Details CEM-3701 Report |
| 212360 | Project ID: 212360 DEA: 010F4004 EFIS: 0116000007 | 01-DN,HUM-96,101,255,299-VAR | BRIDGE JOINT SEAL AND DECK TREATMENT | HUMBOLDT AND DEL NORTE COUNTIES AT VARIOUS LOCATIONS | 11/27/2018 | 1 (04/24/2017) | Details CEM-3701 Report |
| 212361 | Project ID: 212361 DEA: 010F7204 EFIS: 0116000048 | 01-HUM-101-r93.0/r97.5 | MICROSURFACING | HUMBOLDT COUNTY NEAR MCKINLEYVILLE FROM MURRAY ROAD OVERCROSSING TO LITTLE RIVER BRIDGE | 08/27/2018 | 1 (10/03/2017) | Details CEM-3701 Report |
| 212404 | Project ID: 212404 DEA: 031H3504 EFIS: 0316000112 | 03-YUB-5506- | CONSTRUCT MASONRY WALL, DRAINAGE & IRRIGATION, ELECT. PAVE & STRIPE. | YUBA COUNTY IN MARYSVILLE AT THE DISTRICT OFFICE 703 B STREET | 08/06/2019 | 1 (09/15/2017) | Details CEM-3701 Report |
| 212362 | Project ID: 212362 DEA: 041J8204 EFIS: 0414000390 | 04-SOL-5707- | UPGRADE ELECTRICAL SERVICE AND INSTALL EV CHARGING STATIONS. | SOLANO COUNTY IN FAIRFIELD AT THE FAIRFIELD MAINTENANCE STATION AT 2019 WEST TEXAS STREET | 08/08/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212384 | Project ID: 212384 DEA: 043J4904 EFIS: 0415000155 | 04-SON-116-27.9/32.5 | HM 1 - COLD IN-PLACE RECYCLING AND PLACE RHMA-G. | SONOMA COUNTY NEAR SEBASTOPOL AND COTATI FROM 0.1 MILE EAST OF COOPER ROAD TO 0.2 MILE EAST OF GILCHRIST ROAD | 09/12/2019 | 1 (05/20/2017) | Details CEM-3701 Report |
