Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9171-9180 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210105 | Project ID: 210105 DEA: 09359704 EFIS: 0913000031 | 09-MNO-87,101-46.2,96.0 | CONSTRUCT CONCRETE BARRIER AND GUARDRAIL. | MONO COUNTY NEAR LEE VINING AT RUSH CREEK BRIDGE AND NEAR SONORA JUNCTION AT WEST WALKER RIVER BRIDGE | 07/07/2015 | 1 (04/28/2015) | Details CEM-3701 Report |
| 210106 | Project ID: 210106 DEA: 072W5805 MINOR: 07A3589 | 07-LA-605-13.3 | This Project is to replace a damaged Overhead Sign on Route 605 @ PM 13.3 prior to Whittier Blvd exit ramp. | Route 605 @ PM 13.3 prior to Whittier Blvd exit ramp. | 1 (12/23/2014) | Details CEM-3701 Report | |
| 210108 | Project ID: 210108 DEA: 010B4104 | 01-HUM-101-R40.9/R41.2 | ROCK SLOPE PROTECTION AND UNDERDRAINS | HUMBOLDT COUNTY NEAR REDCREST AT 1.3 MILES NORTH OF REDCREST UNDERCROSSING TO 1.8 MILES SOUTH OF BEAR CREEK BRIDGE | 04/27/2018 | 1 (01/13/2015) | Details CEM-3701 Report |
| 210109 | Project ID: 210109 DEA: 010B4604 EFIS: 0112000129 | 01-HUM-299-32.1 | SOLDIER PILE RETAINING WALL, CONCRETE BARRIER, PAVING AND GUARDRAILING | HUMBOLDT COUNTY NEAR WILLOW CREEK AT 1.2 MILES WEST OF EAST FORK WILLOW CREEK BRIDGE 04-0115 | 01/30/2017 | 1 (01/13/2015) | Details CEM-3701 Report |
| 210110 | Project ID: 210110 DEA: 024E7904 EFIS: 0212000034 | 02-SHA-5-R10.7/R15.5 | INSTALL TUBULAR OVERHEAD SIGNS, LIGHTING AND SIGN ILLUMINATION | SHASTA COUNTY IN AND NEAR REDDING FROM 0.1 MILE SOUTH OF SMITH ROAD OVERCROSSING TO 0.1 MILE NORTH OF EAST REDDING SEPARATION | 04/05/2017 | 1 (01/13/2015) | Details CEM-3701 Report |
| 210111 | Project ID: 210111 DEA: 031F4204 EFIS: 0300001119 | 03-BUT-99-40.5/40.8 | WIDEN SHOULDER ON STRUCTURE. | BUTTE COUNTY NEAR CHICO FROM 0.2 MILE SOUTH TO 0.1 MILE NORTH OF ROCK CREEK BRIDGE | 11/30/2017 | 1 (01/02/2015) | Details CEM-3701 Report |
| 210112 | Project ID: 210112 DEA: 041J5204 EFIS: 0414000249 | 04-SM,ALA-84-R28.8/R29.3,R0.5 | INSTALL SIDEWALK, SITE FURNISHINGS, SIGNS, NATIVE PLANTING, IRRIGATION | SAN MATEO AND ALAMEDA COUNTIES IN MENLO PARK AND FREMONT AT PM 29.3 AND PM 0.5 | 10/21/2019 | 1 (09/15/2015) | Details CEM-3701 Report |
| 210113 | Project ID: 210113 DEA: 050T5004 EFIS: 0500020306 | 05-MON,SLO,SB,SCR-1,101,154-Var | VISTA POINT REHABILITATION AND INSTALL INTERPRETIVE DISPLAYS. | MONTEREY, SAN LUIS OBISPO, SANTA BARBARA, AND SANTA CRUZ COUNTIES AT VARIOUS LOCATIONS | 06/01/2016 | 1 (06/29/2015) | Details CEM-3701 Report |
| 210114 | Project ID: 210114 DEA: 09335004 | 09-MNO-120,205-52.3/R53.7 | SLOPE STABILIZATION, EROSION CONTROL AND PLANT ESTABLISHMENT. | MONO COUNTY NEAR LEE VINING FROM 0.4 MILE NORTH OF NATIONAL FOREST VISITOR CENTER ROAD TO 0.7 MILE NORTH OF PICNIC GROUNDS ROAD | 03/08/2022 | 1 (10/16/2015) | Details CEM-3701 Report |
| 210115 | Project ID: 210115 DEA: 100W5604 EFIS: 1012000010 | 10-SJ-12-5.0/11.0 | REPAIR PAVEMENT FAILURE AND HMA OVERLAY. | SAN JOAQUIN COUNTY AT AND NEAR TERMINOUS FROM POTATO SLOUGH BRIDGE TO 0.2 MILE EAST OF FLAG CITY BOULEVARD | 11/14/2016 | 1 (01/13/2015) | Details CEM-3701 Report |
