Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9121-9130 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994856 | Project ID: 994856 DEA: 010H5604 EFIS: 0117000236 | 01-HUM-299-0.0/R5.7 | PLACE RHMA, REPLACE ASPHALT CONCRETE, AND CONCRETE BARRIER TRANSITION. | HUMBOLDT COUNTY IN AND NEAR ARCATA FROM ROUTE 299/101 SEPARATION TO 0.2 MILE EAST OF BLUE LAKE UNDERCROSSING | 11/03/2025 | 1 (06/08/2023) | Details CEM-3701 Report |
| 993298 | Project ID: 993298 DEA: 010G5804 EFIS: 0117000023 | 01-HUM-101,299-87.5/89.6,0.1 | INSTALL TEMPORARY RAILING, PLACE HMA AND VEGETATION CONTROL. | HUMBOLDT COUNTY IN AND NEAR ARCATA ON ROUTE 101 FROM SAINT LOUIS ROAD OVERCROSSING TO MAD RIVER BRIDGE AND ON ROUTE 299 AT 299/101 SEPARATION | 07/20/2023 | 1 (10/12/2021) | Details CEM-3701 Report |
| 214510 | Project ID: 214510 DEA: 010C9704 EFIS: 0113000094 | 01-HUM-101-79.9/86.3 | ROADWAY EXCAVATION, PLACE HMA & HIGH TENSION CABLE BARRIER. | HUMBOLDT COUNTY IN AND NEAR EUREKA AND ARCATA AT VARIOUS LOCATIONS FROM EUREKA SLOUGH BRIDGE TO 11TH STREET OVERCROSSING | 03/24/2021 | 1 (11/13/2019) | Details CEM-3701 Report |
| 7392 | Project ID: 7392 DEA: 010A7804 EFIS: 0100020346 | 01-HUM-255-0.5/8.3 | BONDED WEARING COURSE | HUMBOLDT COUNTY IN AND NEAR EUREKA AND ARCATA FROM EUREKA CHANNEL BRIDGE TO 0.1 MILE SOUTH OF K STREET | 11/26/2012 | 1 (05/21/2012) | Details CEM-3701 Report |
| 317 | Project ID: 317 DEA: 01490604 | 01-HUM-101-79.9/87.9 | Install Rumble Strips. | HUMBOLDT COUNTY IN AND NEAR EUREKA AND ARCATA FROM EUREKA SLOUGH BRIDGE TO ARCATA OVERHEAD | 03/11/2011 | 1 (04/23/2010) | Details CEM-3701 Report |
| 7561 | Project ID: 7561 DEA: 010A3804 EFIS: 0100020313 | 01-HUM-255-0.2/1.8 | REHABILITATE BRIDGE | HUMBOLDT COUNTY IN AND NEAR EUREKA AT VARIOUS LOCATIONS FROM EUREKA CHANNEL BRIDGE TO SAMOA CHANNEL BRIDGE | 01/02/2015 | 1 (08/30/2012) | Details CEM-3701 Report |
| 209473 | Project ID: 209473 DEA: 010C4804 EFIS: 0113000027 | 01-HUM-101-69.9/75.1 | PLACE RHMA OVERLAY | HUMBOLDT COUNTY IN AND NEAR EUREKA FROM 0.7 MILE SOUTH OF TOMPKINS HILL ROAD OVERHEAD TO 0.4 MILE NORTH OF HERRICK AVENUE OVERCROSSING | 02/23/2016 | 1 (06/20/2014) | Details CEM-3701 Report |
| 215161 | Project ID: 215161 DEA: 010C5704 EFIS: 0113000009 | 01-HUM-101-69.8/75.2 | PLACE RHMA-G, HMA AND CONCRETE BARRIER. | HUMBOLDT COUNTY IN AND NEAR EUREKA FROM 0.8 MILE SOUTH OF TOMPKINS HILL ROAD OVERHEAD TO 0.4 MILE NORTH OF HERRICK AVENUE OVERCROSSING | 04/04/2022 | 1 (09/15/2020) | Details CEM-3701 Report |
| 1000562 | Project ID: 1000562 DEA: 010K9404 EFIS: 0121000033 | 01-HUM-101-74.8/76.1 | LIGHTING SYSTEM, FIBER OPTIC CABLE SYSTEM, AND MINOR CONCRETE. | HUMBOLDT COUNTY IN AND NEAR EUREKA FROM HERRICK AVENUE OVERCROSSING TO 0.1 MILE NORTH OF HIGHLAND AVENUE | 1 (09/23/2024) | Details CEM-3701 Report | |
| 1000925 | Project ID: 1000925 DEA: 010M6304 EFIS: 0123000050 | 01-HUM-211-R74.2/79.3 | MICRO-SURFACING, REPLACE AC SURFACING, AND DELINEATION. | HUMBOLDT COUNTY IN AND NEAR FERNDALE FROM 0.4 MILE SOUTH OF SALT RIVER OVERFLOW TO SINGLEY ROAD | 1 (03/21/2025) | Details CEM-3701 Report |
