Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9101-9110 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7452 | Project ID: 7452 EFIS: 0000001155 Permit Numbers: 05126SE0197 | 05-SCR-9-5.79/6.46 | Detour highway traffic onto local roads for Felton Remembers Parade on May 28, 2012 from 9:30 AM to 12 Noon | Highway 9, Felton | 09/18/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 214534 | Project ID: 214534 EFIS: 0000020505 Permit Numbers: 1117NUJ0616 | 11--94-2.35 | Enter upon State Highway right of way in San Diego County, City of San Diego, on Route 94, post mile 2.35, to abandon an existing 10-inch sewer pipe and install a 15-inch PVC sewer pipe within a 36-inch steel casing by the jack and bore method. | HIGHWAY 94 BETWEEN 29TH STREET AND 30TH STREET. 500+/- WEST OF 30TH STREET. | 1 (10/28/2019) | Details CEM-3701 Report | |
| 7541 | Project ID: 7541 DEA: 041G9414 EFIS: 0400021104 Permit Numbers: 0412NMC1060 0413NRD0313 | 04-CC-4-28.6/30.5 | This project will widen SR4 from to eight lanes,plus auxiliary lanes,in each direction with concrete pavement from Hillcrest Avenue to SR 160. | Hillcrest Ave / SR4 Interchange, Antioch | 11/04/2016 | 2 (12/10/2012) | Details CEM-3701 Report |
| 212200 | Project ID: 212200 Permit Numbers: 04176DP0138 0414NMC2078 | 04--680-14.8/14.8 | Remove concrete curb and gutter. | Hillside Ave, Walnut Creek | 02/03/2020 | 1 (03/13/2017) | Details CEM-3701 Report |
| 1734 | Project ID: 1734 DEA: 040G7804 | 04-NAP-29-6.99 | REPLACE STEEL FINGER JOINT ASSEMBLY | Hinge 2, westbound, Hwy 29 Napa River Bridge | 06/08/2011 | 1 (04/29/2011) | Details CEM-3701 Report |
| 208714 | Project ID: 208714 DEA: 08043514 EFIS: 0800000010 | 08-SBD-58-R22.2/R31.1 | REALIGN AND WIDEN 2 TO 4 LANES EXPRESSWAY | HINKLEY ROAD FROM 2.4 MILES WEST OF HIDDEN RIVER ROAD TO? 0.7 MILE EAST OF LENWOOD ROAD. | 08/29/2018 | 1 (03/22/2013) | Details CEM-3701 Report |
| 211108 | Project ID: 211108 DEA: 101E4404 EFIS: 1015000078 | 10-CAL-4-49.6/R58.0 | HMA RESURFACING. | HMA RESURFACING. | 01/10/2019 | 1 (09/01/2016) | Details CEM-3701 Report |
| 210132 | Project ID: 210132 DEA: 080R2504 EFIS: 0812000054 Permit Numbers: 0814AOP1112 | 08-RIV-10-155.1/156.1 | Enter onto Interstate 10 (I-10) right-of-way at Hobson Way Interchange in the City of Blythe to construct new improvements including new on and off ramps approximately 3,500 feet west of the the existing ramps and to close the existing ramps, as per plan date stamped December 3, 2014 by Caltrans Di | Hobson Way, Blythe | 07/31/2018 | 2 (09/29/2015) | Details CEM-3701 Report |
| 3673 | Project ID: 3673 EFIS: 0000001155 Permit Numbers: 0708NSN1556 | 07-LA-101-6.58/6.58 | Modify existing traffic signal @ intersection Modification is required to provide fire emergency pre-emption for the proposed fire station (#82) . Traffic is also required for the relocation of traffic signal equipment to accommodate the street widening al | Hollywood Blvd./N/B ramps, Los Angeles | 08/24/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 993106 | Project ID: 993106 MINOR: 01A2087 | 01-MEN-175- | Hopland From 1.3 -1.4 Miles West of Mathews Road | 1 (07/06/2021) | Details CEM-3701 Report |
