Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9081-9090 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3449 | Project ID: 3449 DEA: 06442614 EFIS: 0600000971 | 06-FRE-99-26.7/30.6 | Widen freeway and bridges from 4 to 6 lanes. | In Fresno Co. In Fresno From 0.2 Miles North Of Ashlan Ave. Overcrossing To 0.1 Miles North Of Grandtland Ave. Undercrossing | 07/28/2020 | 1 (08/12/2010) | Details CEM-3701 Report |
| 3239 | Project ID: 3239 DEA: 060J1704 EFIS: 0600000161 | 06-FRE-41-23.07/0.15 | O Street Off Ramp Widening | In Fresno at the O Street Off Ramp From SB Rte 41 | 08/19/2021 | 2 (12/19/2014) | Details CEM-3701 Report |
| 211065 | Project ID: 211065 DEA: 060T5804 EFIS: 0615000154 | 06-FRE,MAD-145-40.2/R41.2,R0.0/2.0,11.0/13.6 | PLACE HOT MIX ASPHALT AND REPAIR FAILED AREAS. | IN FRESNO AND MADERA COUNTIES NEAR MADERA FROM W. SHAW AVENUE TOAVENUE 7 AND FROM TOZER STREET TO RIVER ROAD | 02/21/2017 | 1 (10/04/2016) | Details CEM-3701 Report |
| 212933 | Project ID: 212933 DEA: 060W2504 EFIS: 0617000161 | 06-FRE,MAD-99-20.2/31.6,0.0/R1.0 | COLD PLANE EXISTING PAVEMENT AND RESURFACE WITH RUBBERIZED HMA. | IN FRESNO AND MADERA COUNTIES IN AND NEAR FRESNO FROM VENTURA AVENUE OVERCROSSING TO AVENUE 7 OVERCROSSING. | 06/26/2019 | 1 (12/19/2018) | Details CEM-3701 Report |
| 210767 | Project ID: 210767 DEA: 060Q0204 EFIS: 0613000108 | 06-FRE,MAD-41,99,168,180-Var | TREAT BRIDGE DECK AND REPLACE JOINT SEALS. | IN FRESNO AND MADERA COUNTIES ATVARIOUS LOCATIONS | 04/18/2018 | 1 (02/23/2016) | Details CEM-3701 Report |
| 8202 | Project ID: 8202 DEA: 060N7604 EFIS: 0612000023 MINOR: 06A1834 | 06-FRE-41-VAR | Treat bridge deck with methacrylate and replace joint seals | IN FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS | 10/16/2020 | 1 (12/19/2012) | Details CEM-3701 Report |
| 212896 | Project ID: 212896 DEA: 04160304 EFIS: 0400000429 | 04-ALA-84-13.1/13.5 | NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT | IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). | 1 (09/16/2019) | Details CEM-3701 Report | |
| 209087 | Project ID: 209087 DEA: 044G7004 EFIS: 0413000026 | 04-ALA-680-.9/1.6 | Injection grouting ,grind AC pavement, and overlay with AC | in Fremont from .8 mile north of Scott Creek Road to .3 mile south of East Warren Ave, | 05/09/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 2009 | Project ID: 2009 DEA: 041SS244 EFIS: 0400020794 | 04-ALA-680-.38 | Construct Rock Slope Protection | In Fremont at Scott Creek Rd | 06/21/2013 | 1 (08/09/2011) | Details CEM-3701 Report |
| 214335 | Project ID: 214335 DEA: 044Q2604 EFIS: 0419000370 | 04-ALA-84-21.9, 21.90 | Reconstruct with RSP | In Fremont / Livermore at 1.1 miles west of Ruby Hills Drive | 01/13/2023 | 1 (09/16/2019) | Details CEM-3701 Report |
