Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 9031-9040 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993305Project ID: 993305
Permit Numbers: 04216US0226
04-SCL-880-7.4/7.5PG&E has a project coming up where we will be retiring in place a gas transmission pipeline under state highway 880. This pipeline needs to be retired in place rather than removed due to trenching across the highway would leave a big patch as well as causing severe traffic disruptions. InsteadHighway 880, Milpitas06/22/20221 (10/07/2021)Details CEM-3701 Report
2526Project ID: 2526
EFIS: 0000001155
Permit Numbers: 05096UL0263
05-SCL-9-0.18/2.91Place 4-inch conduit along highway to replace overhead poles and cables in State right of way; 4-inch conduit will allow 3 1-1/4-inch inner ducts for broadband cable.Highway 9, Boulder Creek04/29/2011NOT VERIFIEDDetails CEM-3701 Report
7452Project ID: 7452
EFIS: 0000001155
Permit Numbers: 05126SE0197
05-SCR-9-5.79/6.46Detour highway traffic onto local roads for Felton Remembers Parade on May 28, 2012 from 9:30 AM to 12 NoonHighway 9, Felton09/18/2018NOT VERIFIEDDetails CEM-3701 Report
214534Project ID: 214534
EFIS: 0000020505
Permit Numbers: 1117NUJ0616
11--94-2.35Enter upon State Highway right of way in San Diego County, City of San Diego, on Route 94, post mile 2.35, to abandon an existing 10-inch sewer pipe and install a 15-inch PVC sewer pipe within a 36-inch steel casing by the jack and bore method.HIGHWAY 94 BETWEEN 29TH STREET AND 30TH STREET. 500+/- WEST OF 30TH STREET. 1 (10/28/2019)Details CEM-3701 Report
7541Project ID: 7541
DEA: 041G9414
EFIS: 0400021104
Permit Numbers: 0412NMC1060 0413NRD0313
04-CC-4-28.6/30.5This project will widen SR4 from to eight lanes,plus auxiliary lanes,in each direction with concrete pavement from Hillcrest Avenue to SR 160.Hillcrest Ave / SR4 Interchange, Antioch11/04/20162 (12/10/2012)Details CEM-3701 Report
212200Project ID: 212200
Permit Numbers: 04176DP0138 0414NMC2078
04--680-14.8/14.8Remove concrete curb and gutter.Hillside Ave, Walnut Creek02/03/20201 (03/13/2017)Details CEM-3701 Report
1734Project ID: 1734
DEA: 040G7804
04-NAP-29-6.99REPLACE STEEL FINGER JOINT ASSEMBLYHinge 2, westbound, Hwy 29 Napa River Bridge06/08/20111 (04/29/2011)Details CEM-3701 Report
208714Project ID: 208714
DEA: 08043514
EFIS: 0800000010
08-SBD-58-R22.2/R31.1REALIGN AND WIDEN 2 TO 4 LANES EXPRESSWAYHINKLEY ROAD FROM 2.4 MILES WEST OF HIDDEN RIVER ROAD TO? 0.7 MILE EAST OF LENWOOD ROAD.08/29/20181 (03/22/2013)Details CEM-3701 Report
211108Project ID: 211108
DEA: 101E4404
EFIS: 1015000078
10-CAL-4-49.6/R58.0HMA RESURFACING.HMA RESURFACING.01/10/20191 (09/01/2016)Details CEM-3701 Report
210132Project ID: 210132
DEA: 080R2504
EFIS: 0812000054
Permit Numbers: 0814AOP1112
08-RIV-10-155.1/156.1Enter onto Interstate 10 (I-10) right-of-way at Hobson Way Interchange in the City of Blythe to construct new improvements including new on and off ramps approximately 3,500 feet west of the the existing ramps and to close the existing ramps, as per plan date stamped December 3, 2014 by Caltrans DiHobson Way, Blythe07/31/20182 (09/29/2015)Details CEM-3701 Report