Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9021-9030 of 19017 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208938 | Project ID: 208938 DEA: 060M4204 EFIS: 0600000964 | 06-FRE-41,180-R24.5/24.8,R57.9/R58.6 | REPLACE THE EXISTING METAL BEAM GUARD RAIL WITH CONCRETE BARRIER . | FRESNO COUNTY IN FRESNO ON ROUTE 41 FROM THE ROUTE 180/41 CONNECTOR TO OLIVE AVENUE UNDERCROSSING AND ON ROUTE 180 FROM BLACKSTONE AVENUE UNDERCROSSING TO ROUTE 180/41 CONNECTOR. | 12/08/2020 | 1 (06/11/2014) | Details CEM-3701 Report |
| 3416 | Project ID: 3416 DEA: 06397904 | 06-FRE-145-34.1/35.1 | EXCAVATE, PAVE ROADWAY AND MODIFY SIGNAL AND LIGHTING. | FRESNO COUNTY IN KERMAN FROM CALIFORNIA AVENUE TO ROUTE 180 | 07/28/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 211947 | Project ID: 211947 DEA: 060T7304 EFIS: 0615000224 | 06-FRE-145,168-34.1/35.1,R9.9/18.5 | SLURRY SEAL AND ASPHALTIC EMULSION (FOG SEAL COAT). | FRESNO COUNTY IN KERMAN ON ROUTE 145 FROM SAN JOAQUIN VALLEY RAILROAD TO ROUTE 180 AND IN AND NEAR CLOVIS ON ROUTE 168 FROM 0.7 MILE EAST OF TEMPERANCE AVENUE UNDERCROSSING TO SAMPLE ROAD | 08/30/2017 | 1 (08/30/2017) | Details CEM-3701 Report |
| 993588 | Project ID: 993588 DEA: 061E1004 EFIS: 0621000211 | 06-FRE-33,180-61.4/R62.5,23.5/24.6 | SLURRY SEAL AND MODIFY ELECTRICAL SYSTEMS. | FRESNO COUNTY IN MENDOTA ON ROUTE 33 FROM BELMONT AVENUE TO BASS AVENUE AND ON ROUTE 180 FROM ROUTE 33 TO BELMONT AVENUE | 12/21/2022 | 1 (03/07/2022) | Details CEM-3701 Report |
| 3340 | Project ID: 3340 DEA: 060L6204 | 06-FRE-99-R4.9 | REPAIR AND RELINE CULVERT | FRESNO COUNTY IN SELMA AT MCCALL AVENUE UNDERCROSSING | 12/30/2011 | 1 (04/25/2011) | Details CEM-3701 Report |
| 1002089 | Project ID: 1002089 DEA: 061J3404 EFIS: 0626000068 MINOR: 06A3234 | 06-FRE-99-7.28/7.28 | Remove and replace existing electrical sign (fog system sign F29) and install conductors, wiring, camera pole, controller cabinet, traffic control, and portions of the existing guardrail | Fresno County in the City of Selma along SB SR 99 at PM 7.28 | 1 (04/14/2026) | Details CEM-3701 Report | |
| 994111 | Project ID: 994111 DEA: 061E2104 EFIS: 0621000226 | 06-FRE-5-8.0 | REPLACE JOINT SEALS, PREPARE AND PLACE POLYESTER CONCRETE OVERLAY. | FRESNO COUNTY NEAR AVENAL AT ARROYO PASAJERO BRIDGE | 08/23/2023 | 1 (07/14/2022) | Details CEM-3701 Report |
| 213103 | Project ID: 213103 DEA: 060V5004 EFIS: 0616000161 | 06-FRE-5-0.0/10.0 | DIGOUTS AND RUBBERIZED BONDED WEARING COURSE TYPE O RESURFACING. | FRESNO COUNTY NEAR AVENAL FROM FRESNO/KINGS COUNTY LINE TO 0.9 MILE SOUTH OF EL DORADO AVENUE | 12/07/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212932 | Project ID: 212932 DEA: 060V2304 EFIS: 0617000173 | 06-FRE-168-R11.8/18.5 | RHMA RESURFACING | FRESNO COUNTY NEAR CLOVIS FROM SHEPHERD AVENUE TO SAMPLE ROAD | 12/07/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 7500 | Project ID: 7500 DEA: 060H9404 EFIS: 0600000150 | 06-FRE-168-R14.4/R15.0 | REALIGNMENT HORIZONTAL CURVE | FRESNO COUNTY NEAR CLOVIS, FROM 0.4 MILE WEST OF SHEPHERD AVENUE TO 0.3 MILE EAST OF SHEPHERD AVENUE | 02/04/2013 | 1 (10/10/2012) | Details CEM-3701 Report |
