Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 9011-9020 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001912 | Project ID: 1001912 DEA: 113A7744 EFIS: 1124000173 COOP: NONE MINOR: 11A4121 | 11-IMP-98,111-31.30, 32.88, R2.21 | Replace existing controller cabinet, pedestrian signal, vehicle signal, camera detector, APS and cables of a traffic signal system. Install an intersection camera. | IN IMPERIAL COUNTY IN THE CITY OF CALEXICO ON ROUTE 98 AT KLOKE ROAD AND ENCINAS AVENUE AND ON ROUTE 111 AT COLE ROAD. | 1 (02/05/2026) | Details CEM-3701 Report | |
| 210630 | Project ID: 210630 DEA: 11076714 EFIS: 1115000108 | 11-IMP-5708- | REPLACE EXISTING EL CENTRO MAINTENANCE STATION AT 1102 MONTENEGRO WAY | IN IMPERIAL COUNTY IN EL CENTRO AT THE EL CENTRO MAINTENANCE STATION. | 04/06/2018 | 1 (01/19/2016) | Details CEM-3701 Report |
| 6049 | Project ID: 6049 DEA: 11241104 | 11-IMP-86-19.5 | RUBBER ASPHALT CHIP SEAL | IN IMPERIAL COUNTY IN BRAWLEY AND NEAR WESTMORLAND FROM 0.5 KM NORTHOF LEGION ROAD TO SOUTH JUNCTIONROUTE 78 AND FROM LONE TREE WASH TO SAN FELIPE CREEK | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 6127 | Project ID: 6127 DEA: 11275904 | 11-IMP-8-28 | ASPHALT RUBBER CHIP SEAL | IN IMPERIAL COUNTY IN AND NEAREL CENTRO FROM 2.7 KM WEST OF NEW RIVER BRIDGE TO ROUTE 8 AND 111 SEPARATION | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 6161 | Project ID: 6161 DEA: 11281104 | 11-IMP-111-23.9 | CHIP SEAL | IN IMPERIAL COUNTY IN AND NEARBRAWLEY AND CALIPATRIA FROM NEW RIVER BRIDGE TO MAIN STREET | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 1000360 | Project ID: 1000360 DEA: 113A5994 EFIS: 1123000040 MINOR: 11A3656 | 11-IMP-78-13.169 | Upgrade Census System | In Imperial County at various locations. | 1 (05/30/2024) | Details CEM-3701 Report | |
| 6066 | Project ID: 6066 DEA: 11258304 | 11-IMP-86-17.8 | TREAT BRIDGE DECK | IN IMPERIAL COUNTY AT VARIOUS LOCATIONS FROM CENTRAL MAIN CANAL BRIDGE TO ZANTHE DITCH BRIDGE | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
| 1000984 | Project ID: 1000984 DEA: 112N1924 EFIS: 1123000087 MINOR: 11A3912 | 11-SD-111-58.43/65.38 | Culvert Repairs | in Imperial County at Various Locations From 0.8 Miles West of Avenue A to Hot Springs Road | 1 (02/20/2025) | Details CEM-3701 Report | |
| 210706 | Project ID: 210706 DEA: 11423404 EFIS: 1116000025 | 11-IMP-78-75 | Repair Storm damage to Roadway | In Imperial County at SR 78 just at PM 75.0 | 1 (11/01/2010) | Details CEM-3701 Report | |
| 6097 | Project ID: 6097 DEA: 11266804 | 11-IMP-186-0 | RESURFACE ROADWAY | IN IMPERIAL COUNTY AT ANDRADE FROMTHE MEXICO BORDER TO 0.1 KM SOUTH OF ROUTE 186 AND 8 SEPARATION AVENUE OVERCROSSING | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
