Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8981-8990 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212027 | Project ID: 212027 DEA: 010G7804 EFIS: 0117000059 | 01-MEN-175-1.6, 1.60 | Bank stabilization | 12/24/2020 | 1 (10/03/2017) | Details CEM-3701 Report | |
| 212028 | Project ID: 212028 DEA: 010G8404 EFIS: 0117000066 | 01-HUM-96-7.8/8.0, 4.0/8.0 | remove slide and stabilize slope | 01/07/2019 | 1 (10/03/2017) | Details CEM-3701 Report | |
| 212086 | Project ID: 212086 DEA: 071XC304 EFIS: 0717000223 | 07-LA-210-20.6, 20.60 | Pavement, place CIPP in existing culverts. | 08/23/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 212449 | Project ID: 212449 Permit Numbers: 0815NMC0792 08176DP0728 0817NRT1031 08186RW0372 | 08-SBD-62-27.6/27.6 | Enter onto State Route 62 (SR-62) right-of-way at Lear Avenue in the City of Twentynine Palms to install 6-phase traffic signal at the intersection, align future Lear Avenue on south leg with intersection and shift Twentynine Palms Outer Highway South to accommodate new signal hardware as per plans | Lear Avenue, Twentynine Palms | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
| 212030 | Project ID: 212030 DEA: 010F9104 EFIS: 0116000091 | 01-LAK-29-VAR | REPLACE ASPHALT CONCRETE SURFACING, INDUCTIVE LOOP DETECTORS, STRIPING | LAKE COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF ROUTE 281 TO 0.1 MILE NORTH OF ROUTE 175 | 09/22/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 212031 | Project ID: 212031 DEA: 021H8804 EFIS: 0216000015 | 02-SHA-VAR-VAR | POLYESTER CONCRETE OVERLAY, JOINT SEALS, HMA, GUARDRAIL, STRIPING | SHASTA COUNTY AT VARIOUS LOCATIONS | 09/02/2020 | 1 (07/28/2017) | Details CEM-3701 Report |
| 212032 | Project ID: 212032 DEA: 060T7704 EFIS: 0615000228 | 06-KER-155-64.8/R70.9 | RESURFACE EXISTING PAVEMENT WITH HOT MIX ASPHALT (TYPE A) | KERN COUNTY NEAR LAKE ISABELLA FROM OLD ROUTE 155 TO 0.1 MILE WEST OF ROUTE 155/178 SEPARATION | 10/10/2017 | 1 (10/10/2017) | Details CEM-3701 Report |
| 212033 | Project ID: 212033 DEA: 112M9804 EFIS: 1116000121 | 11-SD-75,78,805-VAR | MILL AND REPLACE WITH RHMA OVERLAY. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212034 | Project ID: 212034 DEA: 120C5714 | 12-ORA-91-0.9/5.4 | HIGHWAY PLANTING AND IRRIGATION REPLACEMENT | ORANGE COUNTY IN ANAHEIM AND FULLERTON FROM 0.3 MILES WEST OF BROOKHURST STREET UNDERCROSSING TO 0.2 MILES EAST OF STATE COLLEGE BOULEVARD UNDERCROSSING | 01/04/2021 | 1 (05/09/2017) | Details CEM-3701 Report |
| 212035 | Project ID: 212035 DEA: 044K2504 EFIS: 0417000285 | 04-ALA-13-9.2, 9.2/10.3, 9.20 | Replace Culverts back fill sinkhole | 08/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
