Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8971-8980 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000373 | Project ID: 1000373 DEA: 020K8904 EFIS: 0224000016 | 02-TEH-36-81.6/83.4 | Mineral Multi-Use Path and Shoulders, Class 1 Bike Path/Shoulder Widening Project | In Tehama County at and near Mineral 0.1 mile East of Battle Creek Bridge to 0.3 mile East of route 172. RPH | 1 (06/03/2024) | Details CEM-3701 Report | |
| 995079 | Project ID: 995079 DEA: 023J3704 EFIS: 0222000039 | 02-TEH-36-81.6/83.4 | Mineral Multi-Use Path and Shoulders | 1 (10/24/2024) | Details CEM-3701 Report | ||
| 214398 | Project ID: 214398 DEA: 024H4004 EFIS: 0218000115 MINOR: 02A1828 | 02-TEH-36-82.2 | Mineral M.S. Material Bunker Project | Mineral Maintenance Station | 12/23/2020 | 1 (09/09/2019) | Details CEM-3701 Report |
| 1000755 | Project ID: 1000755 DEA: 061A6704 EFIS: 0620000070 | 06-MAD-41-15.4/-22.1 | MINARETS CAPM- 1 CMS and concrete barrier transition blocks for a bridge | 1 (05/08/2025) | Details CEM-3701 Report | ||
| 212588 | Project ID: 212588 DEA: 081C1004 | 08-SBD-18-9.1/R17.8 | MILL, OVERLAY, UPGRADE DIKE AND GUARDRAIL ON STATE ROUTE 18 | SAN BERNARDINO COUNTY NEAR CRESTLINE FROM 0.1 MILE SOUTH OF ARROWHEAD SPRINGS ROAD TO ROUTE 18/138 SEPARATION | 06/23/2021 | 1 (12/31/2018) | Details CEM-3701 Report |
| 7740 | Project ID: 7740 DEA: 080K2704 EFIS: 0800020492 | 08-SBD-40-R119.0/R138.3 | MILL, OVERLAY AC, METAL BEAM GUARD RAILS, DIKES AND OVER SIDE DRAINS | SAN BERNARDINO COUNTY NEAR NEEDLES FROM 0.5 MILE WEST OF TANK TOWER DITCH TO BUZZARD WASH | 11/26/2014 | 1 (11/19/2012) | Details CEM-3701 Report |
| 213123 | Project ID: 213123 DEA: 112N0134 EFIS: 1117000158 | 11-IMP-86-20.4/21.8,R27.0/28.0 | MILL AND REPLACE WITH SAMI AND RHMA, CONSTRUCT SIDEWALK AND BUS PADS | IMPERIAL COUNTY IN AND NEAR BRAWLEY AND WESTMORLAND FROM I STREET TO BRANDT ROAD AND FROM 0.2 MILE SOUTH OF B STREET TO MARTIN ROAD | 12/17/2019 | 1 (05/30/2018) | Details CEM-3701 Report |
| 212033 | Project ID: 212033 DEA: 112M9804 EFIS: 1116000121 | 11-SD-75,78,805-VAR | MILL AND REPLACE WITH RHMA OVERLAY. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 214362 | Project ID: 214362 DEA: 051J2104 EFIS: 0517000072 MINOR: 05A2170 | 05-SB-166-8.8/8.9 | Mill and overlay pavement, construct curb ramps. | Santa Barbara County in Santa Maria at South Junction Route 101/66 Separation | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 211047 | Project ID: 211047 DEA: 081C0914 EFIS: 0814000223 | 08-RIV-60-R12.2/22.1&26.5/30.4 | MILL AND OVERLAY MAINLINE PAVEMENT, SHOULDERS, RAMPS, INCLUDE DIGOUTS | MILL AND OVERLAY MAINLINE PAVEMENT, SHOULDERS, RAMPS, INCLUDE DIGOUTS | 08/09/2018 | 1 (06/24/2016) | Details CEM-3701 Report |
