Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8951-8960 of 19351 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209766 | Project ID: 209766 DEA: 041SS464 EFIS: 0412000605 | 04-CC-680-R17.7/R17.9 | COMPACTION GROUTING AND PCC PAVEMENT REPLACEMENT. | CONTRA COSTA COUNTY IN PLEASANT HILL FROM 0.1 MILE SOUTH TO 0.1 NORTH OF MONUMENT BOULEVARD... | 06/29/2015 | 1 (11/17/2014) | Details CEM-3701 Report |
| 209767 | Project ID: 209767 DEA: 043G6504 EFIS: 0412000150 | 04-SOL-680-0.35/13.10 | 11/30/2016 | 1 (09/02/2014) | Details CEM-3701 Report | ||
| 209768 | Project ID: 209768 DEA: 11298204 EFIS: 1100020530 | 11-SD-80,84,92-6.5/10.4 | REPLACE ASPHALT CONCRETE SURFACING AND SIGNS. | SAN DIEGO COUNTY IN AND NEAR SAN DIEGO FROM 0.2 MILE WEST OF CALIENTE AVENUE TO ROUTE 125 | 08/31/2015 | NOT VERIFIED | Details CEM-3701 Report |
| 209779 | Project ID: 209779 DEA: 040G1904 EFIS: 0400000315 COOP: 042243A2 | 04-ALA-580-R7.8/19.1 | Convert HOV to HOT ( High Occupancy Toll lane or lanes | Along EB I-580 from east of the Greenville Overhead in Livermore to west of Hacienda Drive in Pleasanton | 01/09/2025 | 2 (09/09/2019) | Details CEM-3701 Report |
| 209771 | Project ID: 209771 Permit Numbers: 07146MC0361 | 07-LA-60-12.88/12.88 | Construct 4th leg of existing t-intersection. Modify traffic signal. | Route 60, Industry | 07/31/2018 | 1 (12/02/2014) | Details CEM-3701 Report |
| 210676 | Project ID: 210676 DEA: 09362904 EFIS: 0915000022 MINOR: 09A0622 | 09-MNO-395-75.9 | Bridgeport Maintenance Station Paving Project | IN MONO COUNTY 0.5 MILE SOUTH OF BRIDGEPORT ON SHOP ROAD AT THE BRIDGEPORT MAINTENANCE STATION. | 08/14/2015 | 1 (07/23/2015) | Details CEM-3701 Report |
| 211847 | Project ID: 211847 DEA: 07224104 EFIS: 0700000357 | 07-LA-60-21.5R/23.0R | Construct Interchange -MAINLINE PAVEMENT REPAIR, PCC SLABSC HM1 (RIGID) PROGRAM | CITY OF INDUSTRY & DIAMOND BAR FROM FAIRWAY DR UC TO OLD BREA CYN RD UC | 04/26/2018 | 2 (04/25/2017) | Details CEM-3701 Report |
| 209774 | Project ID: 209774 EFIS: 1012000310 MINOR: 10A1640 | 10-STA-120-6.86 | Install Street Lighting on Route 120 | In Stanislaus County in Oakdale at South Stearns Road | 12/06/2019 | 1 (07/28/2014) | Details CEM-3701 Report |
| 209968 | Project ID: 209968 DEA: 01362914 EFIS: 0112000148 | 01-MEN-101-9.6/10.7,11.2/20.9 | RUBBERIZED HOT MIX ASPHALT OVERLAY | MENDOCINO COUNTY NEAR HOPLAND FROM HOPLAND OVERHEAD BRIDGE TO FELIZ CREEK BRIDGE AND FROM 0.1 MILE NORTH OF FIRST STREET TO ROBINSON CREEK BRIDGE | 02/23/2016 | 1 (12/05/2014) | Details CEM-3701 Report |
| 209777 | Project ID: 209777 EFIS: 1013000115 MINOR: 10A1616 | 10-CAL-4-R58.0/R65.9 | Roadway Delineation | IN CALAVERAS COUNTY IN AND NEAR TAMARACK FROM 1.8 MILE WEST OF CABBAGE PATCH LOG ROAD TO ALPINE COUNTY LINE. | 12/06/2019 | 1 (08/07/2014) | Details CEM-3701 Report |
