Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8921-8930 of 19017 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211878 | Project ID: 211878 DEA: 11418514 EFIS: 1115000139 | 11-IMP-8-R40.4/R45.5,R55.0/65.0 | CONSTRUCT CRCP OVERLAY, HMA-A, AND LIGHTING. | IMPERIAL COUNTY NEAR EL CENTRO FROM 0.5 MILE WEST OF ROUTE 8/111 SEPARATION TO 0.6 MILE WEST OF ANDERHOLT ROAD OVERCROSSING AND FROM 0.5 MILE EAST OF EAST HIGHLINE CANAL BRIDGE TO 0.8 MILE WEST OF EAST JUNCTION ROUTE 98/8 SEPERATION | 01/14/2021 | 1 (06/05/2017) | Details CEM-3701 Report |
| 211879 | Project ID: 211879 DEA: 074T8004 EFIS: 0715000188 MINOR: 07A4023 | 07-LA-405-60 | Install traffic signal and safety lightings | Los Angeles County at SB offà ¢ ramp to Studebaker Rd | 1 (11/10/2016) | Details CEM-3701 Report | |
| 211880 | Project ID: 211880 DEA: 043K36O4 | 04-SCL-680-17 | Replace failed pump | 03/18/2025 | 1 (08/22/2019) | Details CEM-3701 Report | |
| 211882 | Project ID: 211882 Permit Numbers: 0616NMC0921 | 06--- | 04/04/2019 | 1 (11/07/2016) | Details CEM-3701 Report | ||
| 211885 | Project ID: 211885 DEA: 020H7804 | 02-SHA,SIS,TEH-5,44,299-VAR | INSTALL ROADSIDE SIGNS | SHASTA, SISKIYOU, AND TEHAMA COUNTIES AT VARIOUS LOCATIONS | 11/29/2017 | 1 (11/01/2017) | Details CEM-3701 Report |
| 211886 | Project ID: 211886 DEA: 022H3404 EFIS: 0216000089 | 02-MOD-139-28.0/34.0 | HMA OVERLAY, REPLACE AC SURFACING, GUARDRAILING, STRIPING | MODOC COUNTY ABOUT 11 MILES SOUTH OF NEWELL FROM TIONESTA ROAD TO 3.4 MILES NORTH OF PEREZ OVERHEAD | 01/17/2018 | 1 (11/30/2016) | Details CEM-3701 Report |
| 211887 | Project ID: 211887 DEA: 034F7404 EFIS: 0314000265 | 03-NEV-49-23.2/R32.6 | COLD IN-PLACE RECYCLING WITH HMA OVERLAY | NEVADA COUNTY FROM 1.3 MILES NORTH OF SOUTH YUBA RIVER BRIDGE TO YUBA COUNTY LINE | 06/29/2018 | 1 (09/15/2017) | Details CEM-3701 Report |
| 211888 | Project ID: 211888 DEA: 081C6104 | 08-RIV-15-45.6/47.3 | SEDIMENT STABILIZATION/EROSION CONTROL | IN RIVERSIDE COUNTY IN NORCO FROM 6TH STREET OVERCROSSING TO 0.2 MILE SOUTH OF 68TH STREET OVERCROSSING | 09/02/2020 | 1 (12/31/2018) | Details CEM-3701 Report |
| 211889 | Project ID: 211889 DEA: 08368514 EFIS: 0813000077 | 08-SBD-15-81.1/87.5&177.3/181.1 | CONSTRUCT AIF AND DEMOLISH EXISTING AIF IN YERMO | SAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF YERMO ROAD OVERCROSSING TO 1.0 MILE SOUTH OF MINNEOLA ROAD OVERCROSSING AND FROM 1.2 MILE NORTH OF NIPTON ROAD OVERCROSSING TO 0.5 MILE SOUTH OF YATES WELL ROAD OVERCROSSING | 12/09/2019 | 1 (04/07/2017) | Details CEM-3701 Report |
| 211890 | Project ID: 211890 DEA: 11418524 EFIS: 1115000140 | 11-IMP-8-R83.1/R90.0 | CONSTRUCT CRCP OVERLAY, HMA-A, AND LIGHTING. | IMPERIAL COUNTY ABOUT 6 MILES WEST OF WINTERHAVEN FROM 0.7 MILE WEST OF OGILBY ROAD OVERCROSSING TO 0.7 MILE WEST OF ROUTE 186/8 SEPARATION | 10/02/2019 | 1 (08/01/2017) | Details CEM-3701 Report |
