Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8921-8930 of 19017 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209915 | Project ID: 209915 DEA: 060Q2704 EFIS: 0613000050 | 06-FRE-5-48.8/53.0 | PLACE HOT MIX ASPHALT AND CONTINUOUSLY REINFORCED CONCRETE PAVEMENT. | FRESNO COUNTY ABOUT 38 MILES SOUTH OF SANTA NELLA FROM 0.1 MILE SOUTH OF PANOCHE ROAD OVERCROSSING TO 0.2 MILE NORTH OF RUSSELL AVENUE OVERCROSSING. | 08/24/2018 | 1 (12/29/2014) | Details CEM-3701 Report |
| 214643 | Project ID: 214643 DEA: 060Y0604 | 06-FRE-33,198-22.7/24.3,26.8/32.7 | COLD PLANE, HMA AND RHMA PAVING. | FRESNO COUNTY ABOUT 6 MILES NORTH OF COALINGA ON ROUTE 33 FROM 0.9 MILE NORTH OF PALMER AVENUE TO ROUTE 33/198 NORTH JUNCTION AND ABOUT 12 MILES NORTH OF COALINGA ON ROUTE 198 FROM ROUTE 198/5 SEPARATION TO LAKE AVENUE | 10/15/2020 | 1 (01/31/2020) | Details CEM-3701 Report |
| 215607 | Project ID: 215607 DEA: 061C6504 EFIS: 0621000099 | 06-FRE-41-R0.5/M5.9 | RESURFACE AC PAVEMENT AND INSTALL MEDIAN TYPE K CONCRETE BARRIER. | FRESNO COUNTY ABOUT 6 MILES NORTH OF LEMOORE FROM 0.5 MILE NORTH OF EXCELSIOR AVENUE UNDERCROSSING TO 0.2 MILE SOUTH OF ELKHORN AVENUE | 05/04/2022 | 1 (03/29/2021) | Details CEM-3701 Report |
| 10016 | Project ID: 10016 DEA: 06342524 EFIS: 0600000381 | 06-FRE-180-R71.8/74.5 | NEW EXPRESS HIGHWAY | FRESNO COUNTY ABOUT 6.3 MILES EAST OF FRESNO FROM 0.6 MILE WEST OF QUALITY AVENUE TO 0.2 MILE WEST OF SMITH AVENUE | 10/19/2020 | 1 (07/23/2013) | Details CEM-3701 Report |
| 213793 | Project ID: 213793 DEA: 060W7004 EFIS: 0617000283 | 06-FRE-33-24.3/R29.0,R39.9/44.5 | COLD PLANE AC PAVEMENT, PLACE HMA RESURFACING. | FRESNO COUNTY ABOUT 7.8 MILES NORTH OF COALINGA FROM NORTH JUNCTION ROUTE 198 TO SOUTH JUNCTION ROUTE 33/5 AND FROM 0.1 MILE NORTH OF NORTH JUNCTION ROUTE 33/5 TO EL PROGRESSIO ROAD | 08/20/2021 | 1 (01/09/2019) | Details CEM-3701 Report |
| 3206 | Project ID: 3206 DEA: 060H0004 | 06-FRE-41-R1.0/R3.0 | COLD IN-PLACE RECYCLING AND HMA OVERLAY. | FRESNO COUNTY ABOUT 8 MILES NORTH OF LEMOORE FROM LAGUNA AVENUE TO 0.04 MILE SOUTH OF HARLAN AVENUE | 08/25/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 994930 | Project ID: 994930 DEA: 061A7504 EFIS: 0620000180 | 06-FRE-5-26.8/30.0 | CONSTRUCT HIGH-TENSION MEDIAN CABLE BARRIER WITH VEGETATION CONTROL. | FRESNO COUNTY ABOUT 8 MILES WEST OF THREE ROCKS FROM PARKHURST EQUIPMENT UNDERCROSSING TO ROUTE 5/33 SEPARATION | 04/07/2025 | 1 (06/27/2023) | Details CEM-3701 Report |
| 210618 | Project ID: 210618 DEA: 06342534 EFIS: 0600000382 COOP: 061616A2 | 06-FRE-180-R74.1/R78.6 | CONSTRUCT SEGMENT 3 OF KINGS CANYON EXPRESSWAY | FRESNO COUNTY ABOUT 8.4 MILES EAST OF FRESNO FROM 0.7 MILE WEST OF SMITH AVENUE TO 0.7 MILE EAST OF FRANKWOOD AVENUE | 07/06/2021 | 1 (07/10/2017) | Details CEM-3701 Report |
| 1000805 | Project ID: 1000805 DEA: 061G0904 EFIS: 0623000237 | 06-FRE-41-R28.2 | Fre 41 Santa Ana Pump Replace. Remove existing pump, install temporary pump, and replace pump and associated appurtenances. | Fresno County along Route 41 near PM R28.2 at Pump Plant between Shaw Ave and Santa Ana Ave. | 1 (11/19/2024) | Details CEM-3701 Report | |
| 210374 | Project ID: 210374 DEA: 060T1904 | 06-FRE-145-13.2/20.5 | COLD-IN-PLACE-RECYCLING WITH HMA OVERLAY | FRESNO COUNTY AT AND NEAR FIVE POINTS FROM 145 / 269 JUNCTION TO 0.2 MILE NORTH OF KAMM AVENUE | 04/24/2018 | 2 (03/24/2015) | Details CEM-3701 Report |
