Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8901-8910 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211922 | Project ID: 211922 Permit Numbers: 07166MC0756 | 07--1-47/47.4 | Intersection improvement includes: Add an additional left-turn lane, modify traffic signals & striping , new sidewalk, curb & gutter, remove raised median, upgrade curb ramps | PCH, Malibu | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211924 | Project ID: 211924 DEA: 040G6420 EFIS: 0413000350 | 04-MRN-1-001-28.51 | 1 (09/01/2016) | Details CEM-3701 Report | |||
| 211925 | Project ID: 211925 Permit Numbers: 08166MC0244 | 08--71-1.9/1.9 | Enter onto State Route 71(SR-71)right of way at Grand Avenue and Roswell Avenue, in the City of Chino, to do street improvement including cold plane and overlay asphalt concrete paving, new curb return, ADA ramp, curb and gutter, 5 feet wide sidewalk, a southbound right turn lane on Roswell Avenue, | Roswell Avenue and SR-71 northbound ramps, Chino | 09/04/2018 | 1 (12/09/2016) | Details CEM-3701 Report |
| 211927 | Project ID: 211927 DEA: 051H7404 EFIS: 0516000147 | 05-SB,SBT-101-12.3/12.4 | Replace burned out HDPE Culvert | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 211929 | Project ID: 211929 DEA: 030G3204 EFIS: 0315000072 | 03-NEV-20,49-VAR | METHACRYLATE, POLYESTER OVERLAY, AND HMA OVERLAY | NEVADA COUNTY AT VARIOUS LOCATIONS | 08/30/2018 | 1 (09/15/2017) | Details CEM-3701 Report |
| 211930 | Project ID: 211930 DEA: 030G6104 EFIS: 0315000250 | 03-YOL-84-10.9/13.3 | COLD IN-PLACE RECYCLING AND RHMA (GAP GRADED) OVERLAY | YOLO COUNTY AT ARCADE FROM 0.3 MILE NORTH OF WILLOW POINT ROAD TO 1.5 MILES NORTH OF BABEL SLOUGH ROAD | 12/01/2017 | 1 (09/15/2017) | Details CEM-3701 Report |
| 211931 | Project ID: 211931 DEA: 043G6414 EFIS: 0416000348 | 04-NAP-29-37.0 | SCOUR REPLACE BRIDGE | NAPA COUNTY IN CALISTOGA AT NAPA RIVER BRIDGE | 04/22/2020 | 1 (02/15/2017) | Details CEM-3701 Report |
| 211932 | Project ID: 211932 DEA: 051F0304 EFIS: 0513000037 | 05-SCR,SBT-129-1.8/9.9,0.0/0.1 | COLD PLANE ASPHALT PAVEMENT, RESURFACE WITH HMA AND REPLACE GUARDRAIL. | SANTA CRUZ AND SAN BENITO COUNTIES NEAR WATSONVILLE FROM 0.4 MILE EAST OF LAKEVIEW ROAD TO SCHOOL ROAD | 01/02/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 211933 | Project ID: 211933 DEA: 060T7404 | 06-TUL-65,216-0.0/R6.9,2.9/11.7 | POLYMER ASPHALTIC EMULSION SEAL COAT | TULARE COUNTY NEAR DUCOR ON ROUTE 65 FROM KERN COUNTY LINE TO 0.1 MILE SOUTH OF AVENUE 56 AND IN AND NEAR VISALIA ON ROUTE 216 FROM 0.4 MILE EAST OF MCAULIFF STREET TO AVENUE 344 | 10/10/2017 | 1 (10/10/2017) | Details CEM-3701 Report |
| 211934 | Project ID: 211934 DEA: 09366104 | 09-INY,MNO-127,190,168,120,270,395,89-Various | CONSTRUCT RUMBLE STRIPS AND SIGNS. | INYO AND MONO COUNTIES AT VARIOUS LOCATIONS. | 07/31/2018 | 1 (07/31/2018) | Details CEM-3701 Report |
