Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8881-8890 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 96 | Project ID: 96 DEA: 01432604 | 01-LAK-20-009.4/012.1 | SHOULDER WIDENING / RUMBLE STRIP | IN LAKE COUNTY NEAR UPPER LAKE FROM 1.6 KM EAST OF ROUTE 29 TO 0.2KM WEST OF NICE-LUCERNE CUTOFF | 11/10/2010 | 1 (10/22/2009) | Details CEM-3701 Report |
| 2043 | Project ID: 2043 DEA: 04246554 EFIS: 0400000696 | 04-CC-4-47.5/54.2 | SR4 BYPASS | IN LAKE COUNTY NEAR MIDDLETOWN FROM 0.5 KM SOUTH TO 0.2 KM NORTH OF PUTAH CREEK BRIDGE | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 93 | Project ID: 93 DEA: 01429704 | 01-LAK-20-17.2 | MODIFY GUARD RAILING AND CULVERT | IN LAKE COUNTY IN LUCERNE ATLUCERNE CREEK AND DEER CREEK | 03/11/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 7881 | Project ID: 7881 DEA: 013986A4 EFIS: 0112000298 | 01-LAK-53- | WIDEN ROADWAY WITH HMA OVER AB | IN LAKE COUNTY IN AND NEAR CLEARLAKE FROM 0.1 MILE SOUTH OF 40TH AVENUE/LAKESHORE DRIVE TO ROUTE 20/53 JUNCTION | 01/30/2015 | 1 (07/22/2013) | Details CEM-3701 Report |
| 3988 | Project ID: 3988 DEA: 07232304 | 07-LA-101-2.8/13.2 | ROADSIDE MAINTENANCE ACCESS IMPROVEMTNS | IN LAKE COUNTY FROM 7.9 KM WEST OFWALKER RIDGE ROAD TO 1.9 KM WESTOF COLUSA COUNTY LINE | 08/05/2010 | 1 (08/22/2010) | Details CEM-3701 Report |
| 7036 | Project ID: 7036 DEA: 042G6504 EFIS: 0400021073 | 04-CC-24-5.2 | Injection grouting, grind and pave AC, repair culvert | In Lafayette, on eastbound route 24 near Happy Valley Rd Undercrossing | 05/28/2012 | 1 (01/12/2012) | Details CEM-3701 Report |
| 209840 | Project ID: 209840 DEA: 042J2304 EFIS: 0414000466 | 04-CC-24,024-6.8 | Injection grouting , grind and pave AC, repair joint seal | In Lafayette, on eastbound Route 24 at PM 6.8 at Brown Avenue Undercrossing ( Bridge No 28-0131 R) | 08/21/2018 | 1 (12/01/2014) | Details CEM-3701 Report |
| 210687 | Project ID: 210687 DEA: 07316604 | 07-LA-1-41.8/42.1, 41.8-42.1 | INSTALL RSP TO PREVENT HIGH SURF FROM DESTROYING ROADWAY SUPPORT SLOPE, TRAVEL WAY | IN LA,IN MALIBU 1MILE N/O TOPANGE CNY RD | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 210829 | Project ID: 210829 DEA: 07302904 EFIS: 0713000478 | 07-LA-5-C43.9/C46.4 | REPLACE CONCRETE SLABS/PAVEMENT. | IN LA, RT 5 TRUCK LANES CNTY LN ROAD OVERHEAD TO 0.2 MILE SOUTH OF WELDON CANYON OVERCROSSING | 06/25/2019 | 1 (12/16/2015) | Details CEM-3701 Report |
| 4003 | Project ID: 4003 DEA: 072395U4 | 07-LA-110-25.8/31.9 | CONSTRUCT CONCRETE BARRIER IN MEDIAN AND OUTSIDE SHOULDER AREAS | In LA, Pasadena, and South Pasadena from the 5/110 desperation to Glenarm St. | 07/18/2012 | 1 (07/18/2012) | Details CEM-3701 Report |
