Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8871-8880 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 493 | Project ID: 493 DEA: 02258504 | 02-LAS-395-11.8 | ROADWAY REHABILITATION | IN LASSEN COUNTY NEAR HALLELUJAH JUNCTION FROM 6.4 KM SOUTH OF LONG VALLEY CREEK BRIDGE TO 0.2 KM NORTH OF WILLOW RANCH CREEK BRIDGE | 03/11/2011 | 1 (03/02/2006) | Details CEM-3701 Report |
| 626 | Project ID: 626 DEA: 023C2004 | 02-LAS-36-39.3/47.3 | RESURFACE ASPHALT CONCRETE | IN LASSEN COUNTY IN SUSANVILLE FROM QUARRY STREET TO ROUTE 395 | 03/11/2011 | 1 (02/15/2007) | Details CEM-3701 Report |
| 438 | Project ID: 438 DEA: 021C8804 | 02-LAS-44-14.7 | SEAL COAT | IN LASSEN COUNTY FROM CRATER LAKE ROAD TO 0.5 KM WEST OF ROUTE 36 | 03/11/2011 | 1 (05/12/2006) | Details CEM-3701 Report |
| 519 | Project ID: 519 DEA: 022C5504 | 02-LAS-139-.6 | CHIP SEAL | IN LASSEN COUNTY FROM CHESTNUT STREET TO 1.4 KM NORTH OF SLATE CREEK | 03/11/2011 | 1 (06/09/2006) | Details CEM-3701 Report |
| 603 | Project ID: 603 DEA: 02381604 | 02-LAS-395-30.7 | SHOULDER WIDENING AND RUMBLE STRIP | IN LASSEN COUNTY AT AND NEARMILFORD FROM 1.5 KM NORTH OFGARNIER ROAD TO 0.6 KM NORTH OF SUNNYSIDE ROAD | 12/23/2010 | 1 (03/05/2007) | Details CEM-3701 Report |
| 583 | Project ID: 583 DEA: 02357904 | 02-LAS-395-49.5 | REHABILITATE REST AREA | IN LASSEN COUNTY ABOUT 12 KM NORTHOF MILFORD AT THE HONEY LAKE SAFETY ROADSIDE REST AREA | 03/11/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 7324 | Project ID: 7324 DEA: 072P9804 EFIS: 0700001821 MINOR: 07A3171 | 07-LA-L5717- | Maintenance Facility Improvement | In Lancaster at Lancaster Maintenance Station At 44023 Sierra Highway | 12/10/2015 | NOT VERIFIED | Details CEM-3701 Report |
| 212633 | Project ID: 212633 DEA: 081E0504 EFIS: 0813000139 | 08-RIV-74-R14.8/R15.2 | LEFT-TURN CHANNELIZATION & SHOULDER WIDENING | IN LAKE ELSINORE FROM RICHARD STREET TO 0.1 MILE WEST OF BAKER STREET | 06/23/2021 | 1 (03/28/2018) | Details CEM-3701 Report |
| 185 | Project ID: 185 DEA: 01470604 | 01-LAK-29-18.5/19.2 | WIDEN, INSTALL LIGHTING, AND CHANNELS LEFT TURN LANE | In Lake County on Route 29 | 01/12/2010 | 1 (01/21/2010) | Details CEM-3701 Report |
| 210983 | Project ID: 210983 DEA: 010F8004 | 01-LAK-20-35.5/46.5, 35.5-46.5 | Fire Damage Repair Including: Erosion Control, Drainage and Fencing Repairà ¢ à ¦ | In Lake County on Route 20 from 0.48 miles west of Gravel Plant Road to the Colusa/Lake County Line | 12/21/2020 | 1 (02/17/2016) | Details CEM-3701 Report |
