Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8871-8880 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3316 | Project ID: 3316 DEA: 060K9904 | 06-FRE-168-16.6/L29.6 | Reline culverts | FRESNO COUNTY NEAR PRATHER AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF MENDOCINO AVENUE TO 2.5 MILES EAST OF PRATHER POND ROAD | 08/25/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 215531 | Project ID: 215531 DEA: 060Y1004 EFIS: 0620000134 | 06-FRE-168-L27.4/39.7 | PLACE POLYMER ASPHALTIC EMULSION (SEAL COAT). | FRESNO COUNTY NEAR PRATHER FROM 0.1 MILE EAST OF LODGE ROAD TO 0.1 MILE WEST OF CRESSMAN ROAD | 11/22/2021 | 1 (03/10/2021) | Details CEM-3701 Report |
| 214919 | Project ID: 214919 DEA: 060U4504 EFIS: 0615000298 | 06-FRE-168-18.6/T25.5 | COLD PLANE AC PAVEMENT AND HOT MIX ASPHALT RESURFACING. | FRESNO COUNTY NEAR PRATHER FROM 0.1 MILE EAST OF SAMPLE ROAD TO OAK CREEK ROAD | 07/29/2022 | 1 (04/21/2020) | Details CEM-3701 Report |
| 213769 | Project ID: 213769 DEA: 060V3204 EFIS: 0616000136 | 06-FRE-168-11.7/R30.0,L27.4/R36.2 | CONSTRUCT CENTERLINE RUMBLE STRIP AND PLACE PAVEMENT DELINEATION. | FRESNO COUNTY NEAR PRATHER FROM 0.2 MILE EAST OF SHEPHERD AVENUE TO LOCKWOOD LANE AND FROM 1.6 MILES EAST OF AUBERRY ROAD TO TOLLHOUSE ROAD | 04/16/2021 | 1 (12/27/2018) | Details CEM-3701 Report |
| 210586 | Project ID: 210586 DEA: 060M0504 EFIS: 0600000353 | 06-FRE-168-T29.0/T29.4 | REALIGN 2-LANE ROADWAY | FRESNO COUNTY NEAR PRATHER FROM 1.2 MILES WEST OF AUBERRY ROAD TO 0.8 MILE WEST OF AUBERRY ROAD | 05/17/2021 | 1 (07/21/2015) | Details CEM-3701 Report |
| 213655 | Project ID: 213655 DEA: 060V9804 | 06-FRE-43-0.0/7.3 | CONSTRUCT CENTER LINE AND SHOULDER RUMBLE STRIPS. | FRESNO COUNTY NEAR SELMA FROM 0.8 MILE SOUTH OF COLE SLOUGH BRIDGE TO MOUNTAIN VIEW AVENUE | 09/06/2019 | 1 (12/27/2018) | Details CEM-3701 Report |
| 3460 | Project ID: 3460 DEA: 06459904 | 06-FRE-43-0.0/9.3 | REHABILITATE PAVEMENT WITH COLD IN-PLACE RECYCLING AND HMA. | FRESNO COUNTY NEAR SELMA FROM KINGS / FRESNO COUNTY LINE TO ROUTE 99 | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 1001108 | Project ID: 1001108 DEA: 061A0904 EFIS: 0620000065 | 06-FRE-168-49.1/49.5 | SHAVER LAKE VIADUCT | FRESNO COUNTY NEAR SHAVER LAKE FROM 1.3 MILES EAST OF DALTON AVENUE TO 0.2 MILE WEST OF HUNTINGTON LAKE ROAD | 1 (03/25/2025) | Details CEM-3701 Report | |
| 7206 | Project ID: 7206 DEA: 060N2104 EFIS: 0600020450 | 06-FRE-168-52.0/60.0 | COLD PLANE AND OVERLAY WITH HMA (TYPE A, PG-TR) | FRESNO COUNTY NEAR SHAVER LAKE FROM 2.3 MILES EAST OF HUNTINGTON LAKE ROAD TO 1.0 MILE EAST OF FLINTRIDGE ROAD | 10/23/2012 | 1 (08/27/2012) | Details CEM-3701 Report |
| 214292 | Project ID: 214292 DEA: 060Q9004 EFIS: 0614000047 | 06-FRE-180-92.2,130.1 | REPLACE BRIDGE RAILS. | FRESNO COUNTY NEAR SQUAW VALLEY AT MILL CREEK BRIDGE AND NEAR BOYDEN CAVE AT SOUTH FORK KINGS RIVER BRIDGE | 10/29/2020 | 1 (08/05/2019) | Details CEM-3701 Report |
