Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 8771-8780 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
213443Project ID: 213443
DEA: 034F8404
EFIS: 0314000305
03-ED-50-70.6CONVERT MINOR LEG STOP CONTROLLED T-INTERSECTION INTO 3-LEG ROUNDABOUTEL DORADO COUNTY IN MEYERS AT THE JUNCTION OF ROUTE 50 AND 89 SOUTH10/06/20211 (01/04/2019)Details CEM-3701 Report
209028Project ID: 209028
DEA: 01450904
EFIS: 0100000219
01-HUM-169-13.6/23.4WIDEN RDWY WITH HMA OVER AB, CONST SOLDIER PILE AND SOIL NAIL WALLS.HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.8 MILE WEST OF PECWAN CREEK BRIDGE TO 1.0 MILE EAST OF CAPPELL CREEK BRIDGE07/21/20171 (10/08/2013)Details CEM-3701 Report
209019Project ID: 209019
DEA: 071952U4
EFIS: 0700000201
07-VEN-23,101-3.3/3.8,R0.1/R4.5WIDEN FREEWAY AND RAMPS AND RECONSTRUCT MEDIAN.VENTURA COUNTY IN THOUSAND OAKS ON ROUTE 101 FROM 0.6 MILE SOUTH OF WESTLAKE BOULEVARD OVERCROSSING TO 0.4 MILE NORTH OF MOORPARK ROAD UNDERCROSSING AND ON ROUTE 23 FROM ROUTE 101 TO 0.1 MILE NORTH OF HILLCREST DRIVE UNDERCROSSING06/25/20191 (08/13/2013)Details CEM-3701 Report
209020Project ID: 209020
DEA: 07288014
EFIS: 0700020957
07-LA-210-R9.7/R16.1REPLACE EXIST PVMT WITH PCC AND HMA AND REPLACE MEDIAN CONC BARRIER.LOS ANGELES COUNTY IN LOS ANGELES AND GLENDALE FROM 0.2 MILE WEST OF BIG TUJUNGA WASH BRIDGE TO DUNSMORE AVENUE UNDERCROSSING05/10/20171 (10/10/2014)Details CEM-3701 Report
209030Project ID: 209030
DEA: 080K5204
EFIS: 0800000352
08-SBD-15-11.1CONSTRUCT REINFORCED CONCRETE BOX CULVERTSAN BERNARDINO COUNTY IN FONTANA AT DUNCAN CANYON ROAD OVERCROSSING07/24/20141 (08/27/2013)Details CEM-3701 Report
209021Project ID: 209021
DEA: 11265014
EFIS: 1100020306
11-SD--R15.7/R16.3,0.5/3.2INSTALL HIGHWAY PLANTING, AUTOMATIC IRRIGATION SYSTEMS AND LIGHTING.SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 5 FROM 0.1 MILE SOUTH OF PARK BOULEVARD OVERCROSSING TO 6TH AVENUE OVERCROSSING AND ON ROUTE 163 FROM "A&AMP08/07/20181 (06/21/2016)Details CEM-3701 Report
209031Project ID: 209031
DEA: 120H2084
EFIS: 1200000188
12-ORA--17.0/17.7SLOPE REPAIRORANGE COUNTY IN ANAHEIM ON ROUTE 55 AT SANTIAGO BOULEVARD AND NOHL CANYON ROAD01/15/2016NOT VERIFIEDDetails CEM-3701 Report
209022Project ID: 209022
DEA: 081E4904
EFIS: 0814000034
08-RIV-10-27.69Bridge Scour: Replace rock with fabric in two spans of the Rt Bridge and rock armor with fabric all the piers of the left BridgeIn Riv County , 10 miles west of Palm Springs at Whitewater River Bridge #560004L/R 1 (08/01/2013)Details CEM-3701 Report
209023Project ID: 209023
DEA: 073X6604
EFIS: 0712000192
MINOR: 07A3432
07-LA-10-41Construct Soil NailsLos Angeles County in San Dimas 1 (06/17/2014)Details CEM-3701 Report
209024Project ID: 209024
DEA: 11391004
EFIS: 1113000159
MINOR: 11A2146
11-SD-52,125-14.81   1 (03/16/2016)Details CEM-3701 Report