Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8761-8770 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211778 | Project ID: 211778 DEA: 04235654 EFIS: 0400000680 | 04-SM-101,114-1.3/2.5,5.0/5.3 | RECONSTRUCT INTERCHANGE | SAN MATEO COUNTY AT VARIOUS LOCATIONS ON ROUTE 101 FROM 0.4 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.6 MILE SOUTH OF HENDERSON UNDERPASS AND ON ROUTE 114 FROM WILLOW ROAD SEPARATION TO NEWBRIDGE STREET | 01/08/2020 | 1 (10/24/2016) | Details CEM-3701 Report |
| 211794 | Project ID: 211794 DEA: 044G5104 EFIS: 0412000483 | 04-SOL-80-31.4,32.6 | BRIDGE CONSTRUCTION | SOLANO COUNTY IN AND NEAR VACAVILLE AT MERIDIAN ROAD OVERCROSSING AND AT MIDWAY ROAD OVERCROSSING | 09/12/2019 | 1 (01/03/2017) | Details CEM-3701 Report |
| 211779 | Project ID: 211779 DEA: 044A6704 | 04-MRN,SON,NAP-1,29,116,128,131,-VARIOUS | INSTALL CURB RAMPS | MARIN, NAPA, SONOMA, AND NAPA COUNTIES AT VARIOUS LOCATION | 10/12/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211780 | Project ID: 211780 DEA: 07290804 EFIS: 0712000075 | 07-LA-1-2.4/7.2 | CONSTRUCT CURB RAMPS. | LOS ANGELES COUNTY IN LONG BEACH AND SIGNAL HILL FROM SANTIAGO AVENUE TO ROUTE 1/710 SEPARATION | 01/06/2020 | 1 (05/05/2017) | Details CEM-3701 Report |
| 211781 | Project ID: 211781 DEA: 07297404 EFIS: 0713000149 | 07-LA-105,110-6.6R/8.0R&13.2/14.7 | INSTALL SAFETY LIGHTING AT INTERCHANGE | LOS ANGELES COUNTY AT ROUTE 105/110 SEPARATION | 05/26/2022 | 1 (03/22/2017) | Details CEM-3701 Report |
| 211782 | Project ID: 211782 DEA: 07305504 EFIS: 0714000101 | 07-LA-5-13.7/26.7 | CONSTRUCT MIDWEST GUARDRAIL SYSTEM AND CONCRETE BARRIERS. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM ROUTE 710/5 SEPARATION TO ROUTE 134/5 SEPARATION | 09/04/2018 | 1 (03/14/2017) | Details CEM-3701 Report |
| 211783 | Project ID: 211783 DEA: 07307204 EFIS: 0714000216 | 07-LA-91,105,110,and405-Varies | PLACE HIGH FRICTION SURFACE TREATMENT. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS | 04/08/2020 | 1 (12/30/2016) | Details CEM-3701 Report |
| 211784 | Project ID: 211784 DEA: 11085784 EFIS: 1100000064 | 11-SD-163-4.1/4.9 | INTERCHANGE MODIFICATION AND OVERCROSSING WIDENING. | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF FRIARS ROAD OVERCROSSING | 08/10/2021 | 1 (09/05/2017) | Details CEM-3701 Report |
| 211801 | Project ID: 211801 DEA: 112M8304 EFIS: 1115000107 | 11-SD-94-39.0/65.4 | APPLY POLYMER MODIFIED ASPHALTIC EMULSION CHIP SEAL. | SAN DIEGO COUNTY FROM ROUTE 188 TO ROUTE 8 | 09/12/2023 | 1 (11/01/2016) | Details CEM-3701 Report |
| 211802 | Project ID: 211802 DEA: 11421604 EFIS: 1115000142 | 11-SD-78-13.0/14.1 | CONSTRUCT BARRIER, RETAINING WALL AND WIDEN ROAD. | SAN DIEGO COUNTY IN SAN MARCOS FROM 0.1 MILE EAST OF TWIN OAKS VALLEY ROAD OVERCROSSING TO 0.2 MILE WEST OF WOODLAND PARKWAY UNDERCROSSING | 08/16/2021 | 1 (03/21/2017) | Details CEM-3701 Report |
