Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8731-8740 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000805 | Project ID: 1000805 DEA: 061G0904 EFIS: 0623000237 | 06-FRE-41-R28.2 | Fre 41 Santa Ana Pump Replace. Remove existing pump, install temporary pump, and replace pump and associated appurtenances. | Fresno County along Route 41 near PM R28.2 at Pump Plant between Shaw Ave and Santa Ana Ave. | 1 (11/19/2024) | Details CEM-3701 Report | |
| 210374 | Project ID: 210374 DEA: 060T1904 | 06-FRE-145-13.2/20.5 | COLD-IN-PLACE-RECYCLING WITH HMA OVERLAY | FRESNO COUNTY AT AND NEAR FIVE POINTS FROM 145 / 269 JUNCTION TO 0.2 MILE NORTH OF KAMM AVENUE | 04/24/2018 | 2 (03/24/2015) | Details CEM-3701 Report |
| 7840 | Project ID: 7840 DEA: 060H1004 EFIS: 0600020366 | 06-FRE-168-T25.5/R32.9 | REPAIR FAILED AREAS, OVERLAY ROADWAY, AND RECONSTRUCT MBGR. | FRESNO COUNTY AT AND NEAR PRATHER FROM 0.1 MILE NORTH OF OAK CREEK ROAD TO 0.1 MILE NORTH OF SJ AND E ROAD | 10/01/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 3346 | Project ID: 3346 DEA: 060L7904 | 06-FRE-168-T30.2/40.0 | Construct HMA bonded wearing course -gap graded. | FRESNO COUNTY AT AND NEAR PRATHER FROM AUBERRY ROAD AND MORGAN CANYON ROAD INTERSECTION TO 0.2 MILE EAST OF CRESSMAN ROAD | 12/13/2012 | 1 (04/27/2011) | Details CEM-3701 Report |
| 211390 | Project ID: 211390 DEA: 060L3404 EFIS: 0600000301 | 06-FRE-168-T30.1/T30.4 | CONSTRUCT ROUNDABOUT AT INTERSECTION. | FRESNO COUNTY AT PRATHER FROM 0.1 MILE WEST TO 0.1 MILE EAST OF AUBERRY ROAD | 03/12/2020 | 1 (10/04/2016) | Details CEM-3701 Report |
| 208698 | Project ID: 208698 DEA: 060P9304 EFIS: 0612000309 | 06-FRE-63,180-3.8/8.4,79.3/104.1 | OVERLAY ROADWAY AND REPAIR FAILED AREAS. | FRESNO COUNTY AT SQUAW VALLEY AND DUNLAP ON ROUTE 63 FROM 1.2 MILE SOUTH OF ANCHOR AVENUE TO ROUTE 180 AND ON ROUTE 180 FROM FRIANT KERN CANAL BRIDGE TO MILLWOOD ROAD | 10/08/2014 | 1 (08/22/2013) | Details CEM-3701 Report |
| 3185 | Project ID: 3185 DEA: 060G4604 | 06-FRE-5,33-Var | SEAL BRIDGE DECKS WITH METHACRYLATE, REPLACE SEALS AND APPROACH SLABS | FRESNO COUNTY AT VARIOUS LOCATIONS | 12/13/2012 | 1 (04/11/2011) | Details CEM-3701 Report |
| 3364 | Project ID: 3364 DEA: 060M5004 | 06-FRE-33,145,198-VAR | COLD PLANE AND RUBBERIZED HMA OVERLAY | FRESNO COUNTY AT VARIOUS LOCATIONS | 12/13/2012 | 1 (06/24/2011) | Details CEM-3701 Report |
| 7257 | Project ID: 7257 DEA: 060M2304 EFIS: 0600020116 | 06-FRE-41,168,180-Var | REPAIR BRIDGE DECKS AND JOINT SEALS. | FRESNO COUNTY AT VARIOUS LOCATIONS | 01/10/2013 | 1 (06/27/2012) | Details CEM-3701 Report |
| 209101 | Project ID: 209101 DEA: 060Q5504 EFIS: 0613000266 | 06-FRE-168,180-VAR | ELECTRICAL EQUIPMENT REPLACEMENT. | FRESNO COUNTY AT VARIOUS LOCATIONS | 12/14/2020 | 1 (03/11/2014) | Details CEM-3701 Report |
