Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8711-8720 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3906 | Project ID: 3906 DEA: 071P9004 EFIS: 0700000253 MINOR: 07A2483 | 07-LA-210-R18.8 | INSTALL PLASTIC CULVERT LINER | 07/19/2017 | 2 (07/09/2021) | Details CEM-3701 Report | |
| 215654 | Project ID: 215654 DEA: 030J2504 EFIS: 0319000248 | 03-PLA-28-10.2 | INSTALL PLASTIC PIPE WITH CULVERT SLURRY-CEMENT BACKFILL. | PLACER COUNTY AT KINGS BEACH FROM CHIPMUNK STREET TO BEAVER STREET | 10/04/2022 | 1 (04/19/2021) | Details CEM-3701 Report |
| 213832 | Project ID: 213832 DEA: 113A0814 EFIS: 1117000216 MINOR: 11A2778 | 11-IMP-7,98,111-Var | Install point vehicle time detection device in Imperial County in various locations near City of Calexico and the area near the Border with Mexico | Various Locations | 1 (12/24/2018) | Details CEM-3701 Report | |
| 1671 | Project ID: 1671 DEA: 040E5104 | 04-SOL-37-R0.01 | INSTALL POLYESTER CONCRETE OVERLAY AND REPLACE AND JOINT SEAL | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report | |
| 1675 | Project ID: 1675 DEA: 040E5504 | 04-NAP-29-R2.4 | INSTALL POLYSTER CONCRETE OVERLAY | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 214897 | Project ID: 214897 DEA: 024G5804 EFIS: 0214000027 | 02-SHA-5-R31.0/R31.7 | INSTALL POTABLE, NON-POTABLE, AND WASTE WATER IMPROVEMENT. | SHASTA COUNTY ABOUT 9 MILES NORTH OF SHASTA LAKE CITY FROM O'BRIEN SAFETY ROADSIDE REST AREA TO 0.4 MILE SOUTH OF O'BRIEN UNDERCROSSING | 04/04/2022 | 1 (05/26/2020) | Details CEM-3701 Report |
| 1638 | Project ID: 1638 DEA: 040AA114 EFIS: 0400020173 MINOR: 04A3452 | 04-ALA-5730- | Install power generation photovoltaic panels | at San Leandro Maintenance Station | 03/18/2025 | 1 (12/09/2019) | Details CEM-3701 Report |
| 1636 | Project ID: 1636 DEA: 040AA054 EFIS: 0400020171 MINOR: 04A3432 | 04-CC-5744- | Install power generation system using photovoltaic panels | 03/18/2025 | 1 (12/09/2019) | Details CEM-3701 Report | |
| 1637 | Project ID: 1637 DEA: 040AA104 EFIS: 0400020172 MINOR: 04A3451 | 04-CC-5745- | Install power generation system using photovoltaic panels | Walnut Creek East Maintenance Station | 03/18/2025 | 1 (12/09/2019) | Details CEM-3701 Report |
| 2539 | Project ID: 2539 DEA: 050AA034 EFIS: 0500020102 MINOR: 05A1367 | 05-MON-Mon-5723 | Install Power generation system using photovoltaic panels | Monterey Maintenance Station | 03/23/2020 | 1 (11/04/2019) | Details CEM-3701 Report |
