Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8691-8700 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209512 | Project ID: 209512 DEA: 074X2304 EFIS: 0714000228 | 07-LA-39-41.0/44.0 | Clear debris and restore failed drainage systems and repair | In Los Angeles National Forest | 07/10/2015 | 1 (04/22/2014) | Details CEM-3701 Report |
| 209513 | Project ID: 209513 DEA: 033E9804 EFIS: 0300000532 COOP: 030473 Permit Numbers: 0313AOP0738 0314NDP0033 | 03-ED-49-10.7/10.7 | Roadway widening including excavation, embankment, AB installation, CGS, drainage, and signalization | HW 49 at Pleaseant Valley Road, Diamond Springs | 02/06/2015 | 2 (04/04/2014) | Details CEM-3701 Report |
| 209514 | Project ID: 209514 DEA: 06484614 EFIS: 0614000064 COOP: 061576 | 06-KER-58-R52.3/R55.4 | Operational Improvements | On SR 58 from SR 99 separation to Cottonwood Road , and On SR 99 from Ming Ave to SR 58 in the City of Bakersfield | 08/17/2021 | 2 (09/23/2014) | Details CEM-3701 Report |
| 209515 | Project ID: 209515 DEA: 080N3604 EFIS: 0800000526 | 08-RIV-74-34.8/35.9 | Roadway Widening | Hemet | 08/19/2021 | 1 (09/21/2016) | Details CEM-3701 Report |
| 209516 | Project ID: 209516 DEA: 020H1404 EFIS: 0214000132 | 02-TEH-32,032-22.35/22.75 | Improve catchment | In Tehama County about 37 miles east of Forest Ranch from 0.6 mile west of 0.1 mile West of Deer Creek Bridge | 12/21/2020 | 1 (06/20/2014) | Details CEM-3701 Report |
| 209517 | Project ID: 209517 DEA: 051G0204 EFIS: 0514000088 | 05-SLO-1-65.4 | Repair Roadway and Rock Pavement | In San Luis Obispo | 08/27/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 209518 | Project ID: 209518 DEA: 08497104 EFIS: 0800000789 Permit Numbers: 0813NMC0590 0814ARW0215 0814ADP0759 0814ART1126 0816ART0015 | 08-SBD-15-6.3/7.1 | Enter onto Interstate 15 (I-15) right-of-way at Baseline Road and East Ave in the City of Rancho Cucamonga, San Bernardino County, to perform interchange improvement, and street improvement, as per plans and specifications date stamped July 30, 2013 by Caltrans District 8 Encroachment Permits Offic | I-15, Rancho Cucamonga | 12/29/2016 | 2 (04/01/2014) | Details CEM-3701 Report |
| 209519 | Project ID: 209519 DEA: 073P8004 EFIS: 0713000427 MINOR: 07A3507 | 07-LA-101-27.51 | Install Sign Bridge on SB Rte 101 | IN LOS ANGELES COUNTY ON SOUTHBOUND ROUTE 101 OFF-RAMP TO VALLEY CIRCLE BLVD/MULHOLLAND DR IN THE CITY OF LOS ANGELES | 1 (06/04/2014) | Details CEM-3701 Report | |
| 209520 | Project ID: 209520 DEA: 06470904 EFIS: 0600000973 COOP: 061529 | 06-MAD-99-R7.5/15.1 | WIDEN FREEWAY FROM 4 LANES TO 6 LANES. | MADERA COUNTY IN AND NEAR MADERA FROM AVENUE 12 OVERCROSSING TO 0.9 MILE NORTH OF AVENUE 17 OVERCROSSING | 05/11/2023 | 1 (03/16/2016) | Details CEM-3701 Report |
| 209522 | Project ID: 209522 DEA: 101C3404 EFIS: 1014000137 | 10-SJ-4,5,99-Var | Water conservation measures | In SJ and STA Counties | 07/28/2021 | 1 (08/07/2014) | Details CEM-3701 Report |
