Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 8681-8690 of 18781 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214482Project ID: 214482
DEA: 10403503
EFIS: 1000000424
COOP: 104075
10-STA-132-R11.3/R14.7SR 132 West, Freeway / Expressway Phase 1; The Project consists of 4 bridges and 5 retaining walls. Two of the retaining walls include sound walls as part of the development system. This project also includes roadway improvements, landscaping and utiliti.freeway/express way at a new alignment along the adopted State Route 132 route south of Kansas Avenue from Dakota Avenue to east of SR 99 at the Needham Street Bridge Overcrossing03/04/20222 (10/14/2019)Details CEM-3701 Report
212618Project ID: 212618
DEA: 044G0564
EFIS: 0417000154
04-ALA-680-M2.4/M12.4ROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMSFREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING12/08/20221 (10/16/2017)Details CEM-3701 Report
209902Project ID: 209902
DEA: 041G7004
EFIS: 0400020169
Permit Numbers: 0414NMC0687 04146DP1506
04-SF-80-5.5/5.5This project will re-construction the WB I-80 Fremont off-Ramp by Creating a tee -intersection with Fremont st. and eliminating the the current free flowing Fremont Street dual left- turns at the end of the off-ramp.Fremont St., San Francisco08/22/20182 (10/09/2014)Details CEM-3701 Report
215137Project ID: 215137
DEA: 061A6204
EFIS: 0621000026
06-FRE-33-24.8EMERGENCY CULVERT REPAIRSFRESNO 3305/16/20241 (09/01/2020)Details CEM-3701 Report
7056Project ID: 7056
DEA: 060N0704
EFIS: 0600020548
06-KER,KER-5-VarCLEAN AND PAINT EXISTING BRIDGES.FRESNO AND KERN COUNTIES AT VARIOUS LOCATIONS10/08/20141 (06/22/2012)Details CEM-3701 Report
214733Project ID: 214733
DEA: 060R1104
EFIS: 0614000030
06-FRE,KER-119,198-VarCULVERT REPLACEMENT.FRESNO AND KERN COUNTIES AT VARIOUS LOCATIONS.04/21/20211 (03/02/2020)Details CEM-3701 Report
995004Project ID: 995004
DEA: 060U0004
EFIS: 0615000296
06-FRE,KER-33,58-70.6/76.0,27.8BRIDGE PREVENTIVE MAINTENANCE.FRESNO AND KERN COUNTIES IN FIREBAUGH ON ROUTE 33 FROM POSO CANAL BRIDGE TO COLONY MAIN CANAL BRIDGE AND NEAR MCKITTRICK ON ROUTE 58 AT MAIN DRAIN CANAL BRIDGE05/09/20251 (07/27/2023)Details CEM-3701 Report
211596Project ID: 211596
DEA: 060K8004
EFIS: 0612000110
06-FRE,KIN-33,41,43-VarSEISMIC RESTORATIONFRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS12/21/20181 (10/11/2016)Details CEM-3701 Report
213104Project ID: 213104
DEA: 060X4704
EFIS: 0618000078
06-FRE,KIN-5-VarPAVEMENT DELINEATION.FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS12/07/2018NOT VERIFIEDDetails CEM-3701 Report
213946Project ID: 213946
DEA: 060V7404
EFIS: 0617000289
06-FRE,KIN-41,180-VarMETHACRYLATE OVERLAY, JOINT SEALS AND SPALL REPAIR ON THE BRIDGES.FRESNO AND KINGS COUNTIES AT VARIOUS LOCATIONS09/06/20191 (05/07/2019)Details CEM-3701 Report