Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8421-8430 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212896 | Project ID: 212896 DEA: 04160304 EFIS: 0400000429 COOP: NONE | 04-ALA-84-13.1/13.5 | NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT | IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). | 02/02/2026 | 1 (09/16/2019) | Details CEM-3701 Report |
| 211677 | Project ID: 211677 Permit Numbers: 05166DP0411 0514NSN0405 | 05-MON-1-84.48/84.48 | New Traffic Signal, Signal Interconnect, and new Striping on SR-1 at the Imjin Parkway S/B and N/B off-ramps | SR-1 Imjin Pkwy SB and NB off-Ramps, Marina | 08/16/2019 | 1 (08/22/2016) | Details CEM-3701 Report |
| 993262 | Project ID: 993262 Permit Numbers: 04216DP2468 | 04-ALA-112-1.6 | New traffic signal poles, PG&E service, and striping will be installed at the intersection of Davis St. and Carpentier St. in San Leandro, CA. | San Leandro at the intersection of Davis St. and Carpentier St. on SR 112. | 10/14/2022 | 1 (09/15/2021) | Details CEM-3701 Report |
| 212202 | Project ID: 212202 Permit Numbers: 0316NSN0428 | 03--128-7.93/8.21 | New traffic signal installation with sidewalk, bike lane and pavement conform. | SR 128 & Grant Avenue, Winters | 01/08/2019 | 1 (05/26/2017) | Details CEM-3701 Report |
| 796 | Project ID: 796 Permit Numbers: 0309NSN0765 | 03-COL-20-30.09/30.09 | New signal, turn lanes, curb, gutter and sidewlk inprovements, landscape and drainage improvementsSPECIAL FUNDED PROJ. W/ COOP | 425 Webster Street, Colusa | 09/17/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 1011 | Project ID: 1011 DEA: 032E5204 EFIS: 0300000349 | 03-COL-20-30.09 | New signal, turn lanes, curb, gutter and sidewalk improvements, landcape and drainage improvement. | Intersection of Rte 20 and 45 ( 10th & Market Street) in the City of Colusa | 12/08/2017 | 1 (04/21/2010) | Details CEM-3701 Report |
| 3444 | Project ID: 3444 DEA: 06439504 | 06-TUL-198-R16.45 | New Sante Fe Overcrossing Improvement Project No. 46-0266 (Replace Railroad Overcrossing Bridge Number 46-0207) | City of Visalia, Sante Fe Overcrossing | 04/27/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 984 | Project ID: 984 DEA: 032C8104 | 03-NEV-5711- | NEW SAND STORAGE FACILITY TO BE BUILT | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report | |
| 215011 | Project ID: 215011 DEA: 080F3214 EFIS: 0817000014 COOP: 081678 | 08-RIV-215-R27.9/R32.8 | New Ramps on E and W side of I-215 in a Diamond interchange config, shift the E Frontage RD, E of interchange and close the W Frontage Rd. Improvements will require widening of the existing bridge structures, Placentia St O/H over S CA Rail road & I-215. | Limit of work o Placentia Avenue are from Harvill Avenue to the west and Indian Avenue to the East. | 2 (05/19/2020) | Details CEM-3701 Report | |
| 209760 | Project ID: 209760 DEA: 040G2514 EFIS: 0400020535 COOP: 042463 | 04-SF-80,280- | NEW RAMPS & NEW TERMINAL TO RTE 80 BUS STORAGE FACILITY | I-80 AND THE FREMONT STREET OFFRAMP STRUCTURE | 01/04/2018 | 2 (08/11/2014) | Details CEM-3701 Report |
