Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8401-8410 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994974 | Project ID: 994974 DEA: 020K2904 EFIS: 0223000133 | 02-SHA-299-14.7/14.17, 14.17/14.17 | Non-destructive testing (NDT) of butt welds (293 ft) in tension in the fracture critical members fabricated from AASHTO M244 Grade 100 (ASTM A514 / A517) steel on the Whiskey Creek Bridge (Br. No. 06-0096). | AT WHISKEY CREEK BRIDGE | 04/01/2025 | 1 (07/14/2023) | Details CEM-3701 Report |
| 212571 | Project ID: 212571 DEA: 051F79A4 EFIS: 0514000061 | 05-SB-101-55.9/R56.2 | Nojoqui Creek Bridge (51-0018 L/R) widening and rail replacement. | IN SANTA BARBARA COUNTY NEAR BUELLTON AT NOJOQUI CREEK BRIDGE (BR #51-0018 L/R) | 1 (02/20/2020) | Details CEM-3701 Report | |
| 215481 | Project ID: 215481 DEA: 041W6904 EFIS: 0421000074 COOP: 042811 | 04-SCL-85-4.45/20.77 | Noise reduction and/or noise attenuation measures at five (5) locations | Along the State Route 85 (SR 85) corridor | 2 (03/12/2021) | Details CEM-3701 Report | |
| 1000679 | Project ID: 1000679 DEA: 071Q5904 EFIS: 0723000120 MINOR: 07A5842 | 07-LA-10-32.5/32.7 | no involvement from OQASI | 1 (10/14/2024) | Details CEM-3701 Report | ||
| 1001517 | Project ID: 1001517 DEA: 120V8904 EFIS: 1225000100 | 12-ORA-VAR-VAR | Nine Failed Sign Replacements | 1 (08/28/2025) | Details CEM-3701 Report | ||
| 215231 | Project ID: 215231 DEA: 042A3324 EFIS: 0414000039 | 04-ALA-84-10.8/18 | NILES CANYON SAFETY PROJECT | ALAMEDA CREEK BR OH (33-0034) BRIDGE RAIL REPLACEMENT, 2,060 LF; AND STONYBROOK CREEK BRIDGE (SLAB BRIDGE) | 02/29/2024 | 1 (10/19/2020) | Details CEM-3701 Report |
| 212896 | Project ID: 212896 DEA: 04160304 EFIS: 0400000429 | 04-ALA-84-13.1/13.5 | NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT | IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). | 1 (09/16/2019) | Details CEM-3701 Report | |
| 211677 | Project ID: 211677 Permit Numbers: 05166DP0411 0514NSN0405 | 05-MON-1-84.48/84.48 | New Traffic Signal, Signal Interconnect, and new Striping on SR-1 at the Imjin Parkway S/B and N/B off-ramps | SR-1 Imjin Pkwy SB and NB off-Ramps, Marina | 08/16/2019 | 1 (08/22/2016) | Details CEM-3701 Report |
| 993262 | Project ID: 993262 Permit Numbers: 04216DP2468 | 04-ALA-112-1.6 | New traffic signal poles, PG&E service, and striping will be installed at the intersection of Davis St. and Carpentier St. in San Leandro, CA. | San Leandro at the intersection of Davis St. and Carpentier St. on SR 112. | 10/14/2022 | 1 (09/15/2021) | Details CEM-3701 Report |
| 212202 | Project ID: 212202 Permit Numbers: 0316NSN0428 | 03--128-7.93/8.21 | New traffic signal installation with sidewalk, bike lane and pavement conform. | SR 128 & Grant Avenue, Winters | 01/08/2019 | 1 (05/26/2017) | Details CEM-3701 Report |
