Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8381-8390 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211447 | Project ID: 211447 DEA: 11427004 | 11-SD-78-31.9, 31.9 | Repair slope washout and extend drainage system | 1 (11/01/2010) | Details CEM-3701 Report | ||
| 211446 | Project ID: 211446 DEA: 120716U4 | 12-ORA-22,405,605-R0.3/R2.9,20.4/24.0,3.0/R1.6 | APPLY PERMANENT EROSION CONTROL WITH IRRIGATED HIGHWAY PLANTING. | ORANGE COUNTY IN GARDEN GROVE, WESTMINSTER, SEAL BEACH, LONG BEACH, AND LOS ALAMITOS ON ROUTE 22 FROM 2.0 MILES EAST OF BOLSA CHICA ROAD OVERCROSSING TO 22/605 SEPARATION, ON ROUTE 405 0.4 MILES SOUTH OF SEAL BEACH BLVD OVERCROSSING TO 605/405 SEPARATION, | 07/01/2021 | 1 (09/21/2016) | Details CEM-3701 Report |
| 211445 | Project ID: 211445 DEA: 042J2604 EFIS: 0414000469 | 04-SF,SM-101,280-var | TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS. | SAN FRANCISCO AND SAN MATEO COUNTIES AT VARIOUS LOCATIONS | 03/09/2018 | 1 (07/06/2016) | Details CEM-3701 Report |
| 211444 | Project ID: 211444 DEA: 034F9804 EFIS: 0315000019 | 03-SAC-51-4.1/4.4 | CONSTRUCT CONCRETE MEDIAN BARRIER | SACRAMENTO COUNTY IN SACRAMENTO FROM ARDEN WAY RAMP UNDERCROSSING TO 0.3 MILE WEST OF EL CAMINO AVENUE | 11/30/2017 | 1 (08/23/2016) | Details CEM-3701 Report |
| 211443 | Project ID: 211443 DEA: 01293024 EFIS: 0100020336 | 01-MEN-101-42.1 | UPGRADE BRIDGE RAIL | MENDOCINO COUNTY ABOUT 4.0 MILES SOUTH OF WILLITS AT THE SOUTH WILLITS OVERHEAD | 10/30/2017 | 1 (08/12/2016) | Details CEM-3701 Report |
| 211442 | Project ID: 211442 DEA: 010E3604 | 01-HUM-96-3.4/35.9 | REPAIR DRAINAGE SYSTEMS | HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 4.1 MILES EAST OF BRANNAN MOUNTAIN ROAD TO 0.9 MILES EAST OF CEDAR CAMP ROAD | 08/27/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211440 | Project ID: 211440 DEA: 041K6404 | 04-SCL-152-1.8, 1.8, 1.8 | repair slope w launched soil nail wall | 08/22/2018 | 1 (03/02/2017) | Details CEM-3701 Report | |
| 211439 | Project ID: 211439 DEA: 060V4004 | 06-FRE-180-VAR | 02/29/2024 | 1 (06/17/2019) | Details CEM-3701 Report | ||
| 211438 | Project ID: 211438 DEA: 031H6504 | 03-NEV-VAR-VAR | 11/07/2016 | 1 (10/19/2016) | Details CEM-3701 Report | ||
| 211437 | Project ID: 211437 Permit Numbers: 04166DP0808 0415NSN2526 | 04-MRN-1-0.4/0.4 | Modify traffic signal for the intersection of the highway and Tennessee Valley Road including installation of traffic signal heads and rewiring | na, na | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
