Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8341-8350 of 19032 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994921 | Project ID: 994921 DEA: 07385904 EFIS: 0722000164 | 07-LA-118-R10.0/R13.2 | Install irrigation systems & place rock blankets and minor concrete. | CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY IN LOS ANGELES FROM 0.1 MILE WEST OF SEPULVEDA BOULEVARD UNDERCROSSING TO GLENOAKS BOULEVARD UNDERCROSSING. | 12/24/2025 | 1 (07/24/2023) | Details CEM-3701 Report |
| 209937 | Project ID: 209937 DEA: 073P8404 EFIS: 0717000046 MINOR: 07A3632 | 07-LA-10,710-23.37/24.66 | Replace planting and irrigation system | CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY ON ROUTE 405 FROM MANCHESTER OVERCROSSING TO 0.4 MILES NORTH OF LA TIJERA OVERCROSSING | 1 (12/03/2014) | Details CEM-3701 Report | |
| 993104 | Project ID: 993104 DEA: 074P6704 EFIS: 0718000314 MINOR: 07A4997 | 07-LA-138-138/63.7 | Drainage System Restoration | Construction on State Highway In Los Angeles. | 1 (06/29/2021) | Details CEM-3701 Report | |
| 214043 | Project ID: 214043 DEA: 01440604 EFIS: 0113000105 | 01-MEN-1-38.5/74.5 | ROADWAY EXCAVATION AND PLACE HMA (TYPE A). | CONSTRUCTION ON STATE HIGHWAY IN MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 0.3 MILE SOUTH OF NAVARRO BLUFF ROAD TO 0.5 MILE SOUTH OF BLUE SLIDE GULCH BRIDGE. | 06/09/2021 | 1 (06/18/2019) | Details CEM-3701 Report |
| 993690 | Project ID: 993690 DEA: 101L4704 EFIS: 1020000147 MINOR: 10A2308 | 10-MER-5-23.8/24.8 | Right-of-Way Fence Replacement | Construction on State Highway in Merced County on I-5 in and near Santa Nella from Whitworth Road to Delta-Mendota Canal Bridge. | 09/01/2023 | 1 (03/29/2022) | Details CEM-3701 Report |
| 215798 | Project ID: 215798 DEA: 09382504 EFIS: 0919000040 MINOR: 09A0803 | 09--395-6.6 | Install CCTV and RWIS | Construction on State Highway in Mono County at Various Locations | 1 (06/09/2021) | Details CEM-3701 Report | |
| 994745 | Project ID: 994745 DEA: 040Y2304 EFIS: 0422000258 | 04-NAP-29-0.0/5.1 | Cold plane AC pavement and place HMA (A). | CONSTRUCTION ON STATE HIGHWAY IN NAPA COUNTY IN AND NEAR AMERICAN CANYON FROM SOLANO COUNTY LINE TO 0.4 MILE NORTH OF AIRPORT BOULEVARD. | 01/10/2024 | 1 (05/10/2023) | Details CEM-3701 Report |
| 993248 | Project ID: 993248 DEA: 120S4104 EFIS: 1220000064 MINOR: 12A1884 | 12-ORA-5-37.9 | (Disneyland drive OH sign structure) MODIFY SIGN PANELS, INSTALL SIGNS AND ROUTE SHIELD PAVEMENT MARKINGS IN ANAHEIM IN ORANGE COUNTY. | CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN ANAHEIM NEAR INTERSTATE 5 NORTHBOUND/SOUTHBOUND ONRAMPS FROM DISNEYLAND DRIVE. | 07/02/2024 | 1 (09/17/2021) | Details CEM-3701 Report |
| 993725 | Project ID: 993725 DEA: 120S7604 EFIS: 1221000037 MINOR: 12A1938 | 12-ORA-91-R0.85 | REPLACE EXISTING DAMAGED SIGNAL POLE | CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN BUENA PARK NEAR STATE ROUTE 91 ON EASTBOUND OF VALLEY VIEW STREET. | 07/02/2024 | 1 (04/11/2022) | Details CEM-3701 Report |
| 993321 | Project ID: 993321 DEA: 120R8304 EFIS: 1219000045 MINOR: 12A1865 | 12-ORA-1-22.0/29.8 | TO IMPROVE SAFETY AND NON-DAYLIGHT CONDITIONS ON SR-1 AT BROKHURST ST., MAGNOLIA ST., NEWLAND ST., 1ST ST., AND WARNER AVENUE INTERSECTIONS BY ADDING LIGHTING AT 5 INTERSECTIONS. | CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN CITY OF HUNTINGTON BEACH | 07/02/2024 | 1 (10/27/2021) | Details CEM-3701 Report |
