Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 8301-8310 of 18865 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
3119Project ID: 3119
DEA: 060E6904
06-KER-395-0.0/T14.6OVERLAY PAVEMENT AND WIDEN SHOULDERS 04/21/20111 (04/29/2008)Details CEM-3701 Report
6133Project ID: 6133
DEA: 11276604
11-IMP-111-001.2/008.2OVERLAY PAVEMENT 08/02/20101 (08/02/2010)Details CEM-3701 Report
211434Project ID: 211434
DEA: 120N3604
EFIS: 1214000004
12-ORA-91-R1.0,5.4OVERLAY OGAC,RETAINING WALL,CONC BARRIER,LIGHTING,SIGNALS,ADA IMPROVEORANGE COUNTY IN BUENA PARK AND ANAHEIM AT VALLEY VIEW STREET OVERCROSSING AND AT STATE COLLEGE BOULEVARD UNDERCROSSING04/04/20181 (09/13/2016)Details CEM-3701 Report
4218Project ID: 4218
DEA: 073P1704
EFIS: 0700000713
MINOR: 07A2934
07-LA-60-22.6OVERLAY OF EXISTING ASPHALT CONCRETE PARKING LOT SURFACE WITH 0.15 FOOT HOT MIX ASPHALT (TYPE B) IN WALNUT UNITED METHODIST CHURCH COMPLEX, AT 20601 LA PUENTE ROAD, IN WALNUT, IN LOS ANGELES COUNTY 08/17/20212 (07/09/2021)Details CEM-3701 Report
2741Project ID: 2741
DEA: 050P0804
05-SB-1-20.6/22.1OVERLAY MICROSURFACING- LOMPOC SEAL COAT 08/10/20101 (08/10/2010)Details CEM-3701 Report
6615Project ID: 6615
DEA: 120H2194
12-ORA-261-0.0/6.3OVERLAY MAINLINE RAMPS AND TOLLPLAZAS WITH RUBBERIZED ASPHALT CONCRETE 07/28/20101 (07/28/2010)Details CEM-3701 Report
6632Project ID: 6632
DEA: 120H3404
12-ORA-55-11.6/17.6OVERLAY LANES WITH OPEN GRADE RUBBERIZERD ASPHALT CONCRETE 07/28/20101 (07/28/2010)Details CEM-3701 Report
6750Project ID: 6750
DEA: 120K2704
12-ORA-133-11.8/12.9OVERLAY HOT MIX ASPHALT OPEN GRADED FRICTION COURSE & TRAFFIC STRIPE.ORANGE COUNTY, IN IRVINE, FROM 0.4 MILE EAST OF PORTOLA PARKWAY UNDERCROSSING TO 0.1 MILE WEST OF IRVINE BOULEVARD OVERCROSSING08/18/20101 (09/22/2010)Details CEM-3701 Report
208731Project ID: 208731
DEA: 081C4304
EFIS: 0812000312
08-RIV-74-63.0/67.5and80.3/R92.3OVERLAY HMA-A AND PERFORM DIGOUTRIVERSIDE COUNTY NEAR IDYLLWILD AND PALM DESERT FROM HURKEY CREEK BRIDGE TO 0.5 MILE WEST OF MORRIS RANCH ROAD AND FROM 0.2 MILE WEST OF PINYON DRIVE TO 1.4 MILES SOUTH OF CAHUILLA WAY03/07/20141 (04/16/2014)Details CEM-3701 Report
6717Project ID: 6717
DEA: 120J7804
12-ORA-405-13.7OVERLAY HMA, INSTALL LOOP DETECTORS, STRIPING AN SIGNING 07/28/20101 (07/28/2010)Details CEM-3701 Report