Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8291-8300 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4218 | Project ID: 4218 DEA: 073P1704 EFIS: 0700000713 MINOR: 07A2934 | 07-LA-60-22.6 | OVERLAY OF EXISTING ASPHALT CONCRETE PARKING LOT SURFACE WITH 0.15 FOOT HOT MIX ASPHALT (TYPE B) IN WALNUT UNITED METHODIST CHURCH COMPLEX, AT 20601 LA PUENTE ROAD, IN WALNUT, IN LOS ANGELES COUNTY | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report | |
| 2741 | Project ID: 2741 DEA: 050P0804 | 05-SB-1-20.6/22.1 | OVERLAY MICROSURFACING- LOMPOC SEAL COAT | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report | |
| 6615 | Project ID: 6615 DEA: 120H2194 | 12-ORA-261-0.0/6.3 | OVERLAY MAINLINE RAMPS AND TOLLPLAZAS WITH RUBBERIZED ASPHALT CONCRETE | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6632 | Project ID: 6632 DEA: 120H3404 | 12-ORA-55-11.6/17.6 | OVERLAY LANES WITH OPEN GRADE RUBBERIZERD ASPHALT CONCRETE | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6750 | Project ID: 6750 DEA: 120K2704 | 12-ORA-133-11.8/12.9 | OVERLAY HOT MIX ASPHALT OPEN GRADED FRICTION COURSE & TRAFFIC STRIPE. | ORANGE COUNTY, IN IRVINE, FROM 0.4 MILE EAST OF PORTOLA PARKWAY UNDERCROSSING TO 0.1 MILE WEST OF IRVINE BOULEVARD OVERCROSSING | 08/18/2010 | 1 (09/22/2010) | Details CEM-3701 Report |
| 208731 | Project ID: 208731 DEA: 081C4304 EFIS: 0812000312 | 08-RIV-74-63.0/67.5and80.3/R92.3 | OVERLAY HMA-A AND PERFORM DIGOUT | RIVERSIDE COUNTY NEAR IDYLLWILD AND PALM DESERT FROM HURKEY CREEK BRIDGE TO 0.5 MILE WEST OF MORRIS RANCH ROAD AND FROM 0.2 MILE WEST OF PINYON DRIVE TO 1.4 MILES SOUTH OF CAHUILLA WAY | 03/07/2014 | 1 (04/16/2014) | Details CEM-3701 Report |
| 6717 | Project ID: 6717 DEA: 120J7804 | 12-ORA-405-13.7 | OVERLAY HMA, INSTALL LOOP DETECTORS, STRIPING AN SIGNING | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 5680 | Project ID: 5680 DEA: 100N5904 | 10-CAL-12-10.2/18.2 | OVERLAY HIGHWAY WITH RUBBERIZED HOT MIX ASPHALT | 04/08/2011 | 1 (11/04/2008) | Details CEM-3701 Report | |
| 2870 | Project ID: 2870 DEA: 050S1804 | 05-SLO-41-41.2/43.8 | Overlay existing roadway with Rubberized HMA. | SAN LUIS OBISPO AT SHANDON FROM WEST CENTRE STREET TO WEST JUNCTION ROUTE 46 | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 209298 | Project ID: 209298 DEA: 051A4604 EFIS: 0500020341 | 05-SB,SLO-166-R25.5/R34.9 | OVERLAY EXISTING ROADWAY WITH RUBBERIZED HMA. | SANTA BARBARA AND SAN LUIS OBISPO COUNTIES ABOUT 17 MILES EAST OF SANTA MARIA FROM ALISOS CREEK BRIDGE TO CUYAMA RIVER BRIDGE | 12/22/2016 | 1 (07/01/2014) | Details CEM-3701 Report |
