Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8291-8300 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5247 | Project ID: 5247 DEA: 08422204 | 08-RIV-78-3.3 | Replace Concrete Bridge. | In Riverside County, near Palo Verde at Palo Verde Drain Bridge | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
| 4949 | Project ID: 4949 DEA: 080H8204 EFIS: 0800000268 | 08-RIV-215-13.00 | I-215/Linnell Lane OC (Widening) | In Riverside County, in the City of Murrieta, at the intersection of I-215 and Linnell Lane | 10/31/2012 | 2 (10/31/2012) | Details CEM-3701 Report |
| 5223 | Project ID: 5223 DEA: 08327804 | 08-RIV-215-12.30/R13.1 | Widen Clinton Keith Rd OC (Bridge 56-0651) | In Riverside County, in the City of Murrieta, at the crossing of Clinton Keith Road and I-215. | 11/17/2009 | 1 (08/13/2013) | Details CEM-3701 Report |
| 5279 | Project ID: 5279 DEA: 08455804 EFIS: 0800000726 | 08-RIV-10-57.4/58.9 | Replace Palm Drive OC and Gene Autry Trail OH | In Riverside County, in Palm Springs, from 0.9km East of Ramon Wash to 0.6km West of Salvia Wash | 07/31/2018 | 2 (10/05/2016) | Details CEM-3701 Report |
| 5298 | Project ID: 5298 DEA: 08472304 | 08-RIV-10-R0.0/R8.2 | PVMNT REHAB,WIDEN BR,PAVE MEDIAN & CONCRETE MEDIAN BARRIER | In Riverside County, in Calimesa and Beaumont, from County Line Rd Undercrossing to Pennsylvania Ave Undercrossing | 10/28/2011 | 1 (10/28/2011) | Details CEM-3701 Report |
| 4984 | Project ID: 4984 DEA: 080J7604 | 08-RIV-243-18 | DRAINAGE PROTECTION AND DEBRIS CLEANING | IN RIVERSIDE COUNTY ON ROUTE 243 FROM POST MILE 18.0 TO 28.3 | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 10039 | Project ID: 10039 DEA: 080F1624 EFIS: 0800000216 | 08-RIV-215-R14.2/R28.5 | INTERSTATE 215 WIDENING | IN RIVERSIDE COUNTY ON ROUTE 215 FROM SCOTT ROAD OVERCROSSING TO NUEVO ROAD OVERCROSSING | 08/25/2021 | 2 (01/22/2013) | Details CEM-3701 Report |
| 4830 | Project ID: 4830 DEA: 080C4104 | 08-RIV-74-87.6 | UPGRADE VISTA POINT | IN RIVERSIDE COUNTY NEARPALM DESERT AT 3.9 KM SOUTH OFBIG HORN DRIVE AT COACHELLA VALLEYVISTA POINT | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 4909 | Project ID: 4909 DEA: 080G6504 | 08-RIV-15-3.2 | OVERLAY ASPHALT CONCRETE | IN RIVERSIDE COUNTY NEAR TEMECULA FROM THE SOUTH JUNCTION OF ROUTE 79 TO JUNCTION ROUTE 215 | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 4969 | Project ID: 4969 DEA: 080J2504 | 08-RIV-79-4.9 | RESURFACE RUBBERIZED ASPHALT | IN RIVERSIDE COUNTY NEAR TEMECULA AT VARIOUS LOCATIONS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
