Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8271-8280 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209103 | Project ID: 209103 DEA: 042L2504 EFIS: 0400000864 MINOR: 04A4093 | 04-SON-116-27.6 | Install In-Roadway-Warning Lights with Flashing Beacons, Rebuild two Curb Ramps to ADA Standards | In Sonoma County, in the City of Sebatopol at Redwood Ave. | 06/08/2020 | 1 (09/03/2013) | Details CEM-3701 Report |
| 993593 | Project ID: 993593 DEA: 120S8804 EFIS: 1221000057 | 12-ORA-57-14.7/22.5 | INSTALL INDIVIDUAL SLAB REPLACEMENT, RHMA AND TRAFFIC STRIPES. | ORANGE COUNTY FROM LINCOLN AVENUE OVERCROSSING IN ANAHEIM TO LOS ANGELES COUNTY LINE IN BREA | 12/13/2022 | 1 (03/21/2022) | Details CEM-3701 Report |
| 921 | Project ID: 921 DEA: 031C9724 | 03-PLA-267-11.9/13.0 | INSTALL INFRASTRUCTURE AND DETENTION BASIN | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report | |
| 6303 | Project ID: 6303 DEA: 11355904 | 11-IMP-7-1.6 | Install infrastructure for radiation detection device | 07/20/2007 | NOT VERIFIED | Details CEM-3701 Report | |
| 6304 | Project ID: 6304 DEA: 11356004 | 11-SD-905-KP19.3 | Install infrastructure for radiation detection device | 07/20/2007 | NOT VERIFIED | Details CEM-3701 Report | |
| 215452 | Project ID: 215452 DEA: 051K8604 EFIS: 0519000033 | 05--,68,156- | INSTALL INSIDE AND OUTSIDE SHOULDER RUMBLE STRIP. | MONTEREY COUNTY AT VARIOUS LOCATIONS | 11/15/2021 | 1 (03/12/2021) | Details CEM-3701 Report |
| 215146 | Project ID: 215146 DEA: 051C4204 EFIS: 0512000141 | 05-SB-154-22.9/23.2 | INSTALL INSPECTION ACCESS SYSTEM AND PAINT BRIDGE. | Cold Spring Canyon Creek Bridge, SANTA BARBARA COUNTY ABOUT 9 MILES NORTH OF SANTA BARBARA FROM 1.4 MILES SOUTH OF PARADISE ROAD TO 0.2 MILE NORTH OF STAGECOACH ROAD | 01/11/2024 | 1 (10/26/2020) | Details CEM-3701 Report |
| 208936 | Project ID: 208936 DEA: 043G9604 EFIS: 0413000034 COOP: 042606 | 04-ALA-880,77,112,185,880- | Install Integrated Corridor Management (ICM) system to manage traffic on arterials during incidents, including closed circuit television cameras, arterial dynamic message signs (ADMS), trailblazer signs (TBS), static signs, communications infrastructure, TM | Oakland Transportation Management Center (TMC), the City of San Leandro TMC, and the Caltrans District 4 TMC, and vehicle detection devices in the northbound and southbound directions of Interstate 880 and on State Routes 61, 77, 112 and 185 | 02/01/2022 | 2 (09/17/2015) | Details CEM-3701 Report |
| 911 | Project ID: 911 DEA: 031C1114 | 03-ED,PLA-28,50,89,267-VAR | INSTALL INTELLIGENT TRANSPORTATION SYSTEM | 03/23/2011 | 1 (03/23/2011) | Details CEM-3701 Report | |
| 384 | Project ID: 384 DEA: 020C5904 EFIS: 0200020000 | 02-SHA-5,44-R3.2/R18.6,L0.3/L1.8 | INSTALL INTELLIGENT TRANSPORTATION SYSTEM. | SHASTA COUNTY IN AND NEAR ANDERSON AND REDDING ON ROUTE 5 FROM 0.6 MILE SOUTH OF ANDERSON SEPARATION TO 0.3 MILE NORTH OF TWIN VIEW BOULEVARD UNDERCROSSING AND ON ROUTE 44 FROM EAST STREET TO EAST REDDING SEPARATION | 06/27/2013 | 1 (04/28/2011) | Details CEM-3701 Report |
