Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8261-8270 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211576 | Project ID: 211576 DEA: 060K8104 EFIS: 0612000108 | 06-KER-99,178-26.8,R2.0 | SEISMIC RESTORATION AND HIGHWAY PLANTING AND IRRIGATION. | KERN COUNTY IN BAKERSFIELD AT AIRPORT DRIVE OVERCROSSING AND AT GOLDEN STATE AVENUE SEPARATION | 01/07/2019 | 1 (12/19/2016) | Details CEM-3701 Report |
| 211575 | Project ID: 211575 DEA: 051C1104 EFIS: 0512000075 | 05-SLO-101-12.4/29.7 | PLACE CONTRASTING SURFACE TREATMENT AT GORE AREAS, REPLACE SIGNS. | SAN LUIS OBISPO COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF BRIDGE STREET UNDERCROSSING TO GRAND AVENUE UNDERCROSSING | 01/04/2018 | 1 (12/01/2016) | Details CEM-3701 Report |
| 211574 | Project ID: 211574 DEA: 051A7504 EFIS: 0512000013 | 05-SB-246-R20.7/26.3 | PLACE RHMA-G, CONSTRUCT CURB RAMPS AND SIDEWALK. | SANTA BARBARA COUNTY IN AND NEAR BUELLTON FROM 0.4 MILE EAST OF SANTA ROSA CREEK BRIDGE TO ROUTE 101/246 SEPARATION | 02/09/2018 | 1 (12/14/2016) | Details CEM-3701 Report |
| 211573 | Project ID: 211573 DEA: 050Q6004 EFIS: 0500020290 | 05-SCR-17-1.0/1.4 | ACACIA ERADICATION AND SLOPE STABILIZATION WITH ROADWAY WORK. | SANTA CRUZ COUNTY NEAR SANTA CRUZ FROM 0.2 MILE NORTH OF PASATIEMPO OVERCROSSING TO BEULAH PARK UNDERCROSSING | 06/04/2019 | 1 (12/14/2016) | Details CEM-3701 Report |
| 211572 | Project ID: 211572 DEA: 010E2004 EFIS: 0114000015 | 01-MEN-1-43.7/69.7 | REPAIR TIMBER CONNECTIONS AND BRIDGE DECK REPAIR | MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM ALBION RIVER BRIDGE TO TEN MILE RIVER BRIDGE | 08/29/2017 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211571 | Project ID: 211571 DEA: 010C3704 EFIS: 0112000283 | 01-MEN-101-R89.2 | CONSTRUCT CONCRETE FISH PASSAGE, REPAIR INVERT, AND MODIFY WEIRS. | MENDOCINO COUNTY NEAR LEGGETT AT CEDAR CREEK ARCH CULVERT | 12/04/2018 | 1 (09/27/2016) | Details CEM-3701 Report |
| 211569 | Project ID: 211569 DEA: 09367804 EFIS: 0917000002 | 09-MNO-395-52.5/54.5 | Debris flow and Rockfall containment | 01/03/2022 | 1 (06/24/2021) | Details CEM-3701 Report | |
| 211568 | Project ID: 211568 MINOR: 07A4022 | 07--- | 1 (06/30/2021) | Details CEM-3701 Report | |||
| 211567 | Project ID: 211567 DEA: 030C9314 EFIS: 0315000138 COOP: 0607,1520 | 03-PLA-28-9.2/10.3 | Kings Beach Commerical Core Improvement - Gateway to the Core- Construct sidewalks, Class II bike lanes, roundabouts, public transit facilities, vehicular parking facilities, bicycle locking facilities, trash receptacles, benches, and street lamps | In Kings Beach on SR 28 in the vicinity of SR 267 and Chipmunk Avenue. | 10/01/2021 | 2 (07/13/2016) | Details CEM-3701 Report |
| 211565 | Project ID: 211565 DEA: 11427704 EFIS: 1116000182 | 11-IMP-78-75.57 | Repair Bridge Deck. | 1 (11/01/2010) | Details CEM-3701 Report |
