Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8251-8260 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7346 | Project ID: 7346 DEA: 051A3104 EFIS: 0500020298 | 05-SB-154-0.0/5.5 | OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | SANTA BARBARA COUNTY AT AND NEAR LOS OLIVOS FROM ROUTE 101 SEPARATION TO 0.4 MILE WEST OF BASELINE AVENUE | 03/14/2013 | 1 (08/22/2012) | Details CEM-3701 Report |
| 209910 | Project ID: 209910 DEA: 051C8604 EFIS: 0513000004 | 05-SCR-1-20.2/37.4 | OVERLAY WITH RHMA-G. | SANTA CRUZ COUNTY NEAR SANTA CRUZ FROM 0.1 MILE NORTH OF WESTERN DRIVE TO SAN MATEO COUNTY LINE | 08/13/2018 | 1 (01/07/2015) | Details CEM-3701 Report |
| 994425 | Project ID: 994425 DEA: 040K5204 EFIS: 0416000098 | 04-SON-12-11.0/T17.4 | Overlay with RHMA, replace guardrails, approach slabs and signs. | Construction on State Highway in Sonoma County from Llano Road to Farmers Lane. | 1 (12/07/2022) | Details CEM-3701 Report | |
| 8019 | Project ID: 8019 DEA: 060N1504 EFIS: 0600020439 | 06-KER-58-R59.6/R64.4,67.0/77.3 | OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 58/184 SEPARATION TO 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING AND FROM 0.3 MILE WEST OF CALIENTE CREEK BRIDGE TO 0.2 MILE EAST OF BEALVILLE ROAD | 10/08/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 7310 | Project ID: 7310 DEA: 060N1404 EFIS: 0600020438 | 06-MAD,MPA-41-40.8/45.7,0.0/4.9 | OVERLAY WITH HMA (TYPE A, WITH PG-TR) | MADERA AND MARIPOSA COUNTIES NEAR OAKHURST FROM 0.1 MILE SOUTH OF CEDAR VALLEY DRIVE TO YOSEMITE PARK BOUNDRY LINE | 11/13/2012 | 1 (08/15/2012) | Details CEM-3701 Report |
| 209504 | Project ID: 209504 DEA: 112M4404 EFIS: 1100020476 | 11-IMP-111-40.5/65.4 | OVERLAY WITH HMA (TYPE A) AND PLACE ASPHALT RUBBER SEAL COAT. | IMPERIAL COUNTY NEAR NILAND FROM MAIN STREET TO IMPERIAL COUNTY LINE | 07/07/2015 | 1 (01/13/2016) | Details CEM-3701 Report |
| 209381 | Project ID: 209381 DEA: 112M6604 EFIS: 1113000110 | 11-IMP-60,215-32.3/39.6 | OVERLAY WITH HMA (TYPE A) AND APPLY ASPHALT RUBBER SEAL COAT. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM ROUTE 111 TO ROUTE 7 | 11/25/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 212065 | Project ID: 212065 DEA: 060V5304 | 06-KER-58,99-28.2/31.4,R43.9/48.7 | OVERLAY WITH GAP GRADED RUBBERIZED HOT MIX ASPHALT | KERN COUNTY IN BUTTONWILLOW ON ROUTE 58 FROM LESLIE LANE TO 0.2 MILE WEST OF ROUTE 5/58 SEPARATION AND NEAR MCFARLAND ON ROUTE 99 FROM LERDO CANAL BRIDGE TO 1.3 MILES NORTH OF WHISLER ROAD OVERCROSSING | 04/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 3487 | Project ID: 3487 DEA: 06480004 | 06-KER-58- 136.4 | OVERLAY WESTBOUND LANES WITH RUBBERIZED ASPHALT CONCRETE (TYPE G) | 04/21/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 5734 | Project ID: 5734 DEA: 100Q6704 | 10-TUO-120-R19.4/R21.6 | OVERLAY VISTA POINTS W/ AC MIX | 04/08/2011 | 1 (11/04/2008) | Details CEM-3701 Report |
