Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8241-8250 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211815 | Project ID: 211815 DEA: 031F9704 EFIS: 0300020469 | 03-SUT,BUT-99-Var | ITS AND OPERATIONAL IMPROVEMENTS. | BUTTE AND SUTTER COUNTIES AT VARIOUS LOCATIONS | 08/30/2018 | 1 (10/20/2016) | Details CEM-3701 Report |
| 213059 | Project ID: 213059 DEA: 023H2204 EFIS: 0217000071 | 02-TEH,BUT-32-0.0/2.7,D2.7/D4.7,4.7/5.0 | PLACE HMA OVERLAY, SHOULDER BACKING, GUARDRAIL & REPLACE AC SURFACING. | BUTTE AND TEHAMA COUNTIES FROM BUTTE COUNTY LINE TO 1.6 MILES EAST OF SODA SPRINGS ROAD | 01/08/2019 | 1 (03/05/2018) | Details CEM-3701 Report |
| 994556 | Project ID: 994556 DEA: 032G7604 EFIS: 0322000155 | 03-BUT-162-22.7/26.9,30.1/31.1 | HMA (TYPE A), ROADWAY EXCAVATION, AND CLASS 2 AB. | BUTTE COUNTY 4.7 MILES EAST OF OROVILLE FROM SADDLE DRIVE TO MIDDLE FORK FEATHER RIVER BRIDGE AND FROM CANYON CREEK BRIDGE TO FOREMAN CREEK ROAD | 05/09/2024 | 1 (05/15/2023) | Details CEM-3701 Report |
| 208613 | Project ID: 208613 DEA: 034M5304 | 03-BUT-99-13.0/20.6 | PAVEMENT REHABILITATION | BUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.2 MILE SOUTH OF NORTH JUNCTION ROUTE 162 TO DRY CREEK BRIDGE | 10/08/2014 | 1 (10/08/2014) | Details CEM-3701 Report |
| 215062 | Project ID: 215062 DEA: 030F2904 EFIS: 0314000101 | 03-BUT-99-14.9/15.7 | CONSTRUCT BRIDGE AND ROADWAY; & REMOVE BRIDGE. | BUTTE COUNTY ABOUT 10 MILES NORTH OF GRIDLEY FROM 0.3 MILE SOUTH TO 0.5 MILE NORTH OF NELSON AVENUE | 03/02/2022 | 1 (07/20/2020) | Details CEM-3701 Report |
| 1194 | Project ID: 1194 DEA: 033M2404 | 03-BUT-32-R23.5/37.0 | Replace Asphalt Concrete Surfacing and Seal Coat (Microsurfacing) | BUTTE COUNTY ABOUT 12 MILES NORTH OF CHICO FROM 0.1 MILE SOUTH OF FOREST RANCH WAY TO HUMBOLDT ROAD | 08/01/2011 | 1 (08/01/2011) | Details CEM-3701 Report |
| 1288 | Project ID: 1288 DEA: 034E1804 | 03-BUT-70-38.1 | PLACE ROCK SLOPE PROTECTION, INSTALL HORIZONTAL DRAINS AND UNDERDRAIN | Butte County about 19 miles East of Oroville at 5.3 miles East of Concow Road. | 03/24/2010 | 1 (03/24/2010) | Details CEM-3701 Report |
| 1300 | Project ID: 1300 DEA: 034E3904 | 03-BUT-70-35.5 | UNDERDRAIN AC DITCH AND AC PAVING | Butte County about 20 miles North of Oroville at 0.1 mile East of Deadwood Road. | 03/24/2010 | 1 (03/24/2010) | Details CEM-3701 Report |
| 6874 | Project ID: 6874 DEA: 034M3204 EFIS: 0300020522 | 03-BUT-70-41.1/48.1 | EXISTING ASPHALT TO BE RESURFACED BY MICRO-SURFACING | BUTTE COUNTY ABOUT 25 MILES NORTH OF OROVILLE FROM NORTH FORK FEATHER RIVER BRIDGE TO THE PLUMAS COUNTY LINE | 07/13/2012 | 1 (06/12/2012) | Details CEM-3701 Report |
| 702 | Project ID: 702 DEA: 024C8204 MINOR: 02A1128 | 02-BUT-32-D4.4/D4.6 | WIDEN SHOULDERS AND LAY BACK SLOPES (See EA : 02-3E8304) | Butte County about 31 miles East of Chico from 1 mile to 1.2 miles East of Soda Springs Road. | 01/04/2010 | NOT VERIFIED | Details CEM-3701 Report |
