Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8231-8240 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213425 | Project ID: 213425 DEA: 010F3804 EFIS: 0115000119 | 01-HUM-101-R93.8/R94.5 | INSTALL HIGH TENSION CABLE BARRIER AND UPGRADE GUARDRAIL | HUM - 101 - R93.8/R94.5 | 07/18/2023 | 1 (08/24/2018) | Details CEM-3701 Report |
| 209365 | Project ID: 209365 DEA: 11406504 EFIS: 1100020324 | 11-SD-15-R36.8/R40.8 | INSTALL HIGH TENSION CABLE BARRIER, UPGRADE MBGR AND TERMINAL SYSTEMS. | SAN DIEGO COUNTY ABOUT 5 MILES NORTH OF ESCONDIDO FROM 0.2 MILE NORTH OF DEER SPRINGS ROAD OVERCROSSING TO GOPHER CANYON ROAD UNDERCROSSING | 02/03/2015 | 1 (08/04/2014) | Details CEM-3701 Report |
| 213387 | Project ID: 213387 DEA: 11421204 EFIS: 1115000083 | 11-SD-52-13.3/14.8 | INSTALL HIGH TENSION CABLE BARRIER, VEGETATION CONTROL | SAN DIEGO COUNTY IN SAN DIEGO AND SANTEE FROM MAST BOULEVARD UNDERCROSSING TO MISSION GORGE ROAD UNDERCROSSING | 09/06/2019 | 1 (09/14/2018) | Details CEM-3701 Report |
| 994697 | Project ID: 994697 DEA: 101L3104 EFIS: 1020000183 | 10-MER-99-0.4/R12.7 | INSTALL HIGH TENSION CABLE BARRIER. | MERCED COUNTY NEAR MERCED FROM 0.4 MILE NORTH OF MADERA COUNTY LINE TO 0.4 MILE SOUTH OF CHILDS AVENUE | 12/17/2024 | 1 (05/09/2023) | Details CEM-3701 Report |
| 995517 | Project ID: 995517 DEA: 101L2604 EFIS: 1020000084 | 10-SJ-120-R1.1/T6.6 | INSTALL HIGH TENSION CABLE MEDIAN BARRIER. | SAN JOAQUIN COUNTY IN AND NEAR MANTECA FROM 0.2 MILE WEST OF YOSEMITE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF MOFATT BOULEVARD OVERHEAD | 03/24/2025 | 1 (12/04/2023) | Details CEM-3701 Report |
| 995181 | Project ID: 995181 DEA: 101L6304 EFIS: 1020000085 | 10-MER-152-R10.1/13.9 | INSTALL HIGH TENSION MEDIAN BARRIER. | MERCED COUNTY IN AND NEAR SANTA NELLA FROM 0.8 MILE WEST OF GONZAGA ROAD TO 1.6 MILES EAST OF HILLDALE | 12/18/2024 | 1 (10/02/2023) | Details CEM-3701 Report |
| 5730 | Project ID: 5730 DEA: 100Q5101 MINOR: 10A1011 | 10-MPA-120-42.60,43.69 | INSTALL HIGHWAY ADVISORY RADIO SYSTEM | 04/17/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 5616 | Project ID: 5616 DEA: 100M0201 MINOR: 10A0910 | 10-SJ-5271- | INSTALL HIGHWAY ADVISORY RADIO SYSTEM AT THE MAINT. YARD | 12/05/2019 | 1 (01/06/2014) | Details CEM-3701 Report | |
| 432 | Project ID: 432 DEA: 021C5904 | 02-TRI-299-77.4/85.0 | INSTALL HIGHWAY ADVISORY SIGNS | 12/23/2010 | NOT VERIFIED | Details CEM-3701 Report | |
| 6696 | Project ID: 6696 DEA: 120J3904 EFIS: 1200000272 MINOR: 12A1197 | 12-ORA-5,405-5.6/13.9,2.9 | INSTALL HIGHWAY ADVISORY SIGNS | 09/28/2013 | NOT VERIFIED | Details CEM-3701 Report |
