Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8191-8200 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211123 | Project ID: 211123 DEA: 081F6504 EFIS: 0815000007 | 08-RIV-60,91,215-Varies | METHACRYLATE BRIDGE DECKS, REPAIR CRACKS, DECK SPALLS, JOINT SEALS | METHACRYLATE BRIDGE DECKS, REPAIR CRACKS, DECK SPALLS, JOINT SEALS | 07/28/2023 | 1 (05/05/2016) | Details CEM-3701 Report |
| 211124 | Project ID: 211124 DEA: 112M7604 | 11-SD,IMP-78-66.0/95.3;0.0/13.2 | REPLACE AC SURFACING AND APPLY ASPHALT RUBBER BINDER SEAL COAT. | REPLACE AC SURFACING AND APPLY ASPHALT RUBBER BINDER SEAL COAT. | 08/08/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211126 | Project ID: 211126 DEA: 041SS424 EFIS: 0412000601 | 04-ALA-680-R20.2 | Reconstruct slope and roadway and construct retaining wall to prevent further downhill slippage and failure of the roadway. | In Alameda County at Route 580/680 Separation | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 211125 | Project ID: 211125 DEA: 120N2504 EFIS: 1213000185 | 12-ORA-133,405-8.3,13.7,14.7,22.5 | RAMP WIDENING, COLD PLANE AC PVMT & HMA PAVING, HWY LIGHTING | In Orange County in various location on Rte 133 & 405 | 10/16/2017 | 1 (03/07/2016) | Details CEM-3701 Report |
| 211127 | Project ID: 211127 Permit Numbers: 05146MC0563 05156RT0701 | 05-SLO-41-44.66/45.1 | To provide construction and operations access to the California Flats Solar Project. First Solar will be widening SR41 at Turkey Flat Rd (PM 44.9)to accommodate a northbound left turn lane, a northbound median acceleration lane, and a southbound right turn lane. The geometrics for the left turn lan | Turkey Flat Rd, Cholame | 09/17/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211128 | Project ID: 211128 DEA: 022H3004 | 02-SIS-96-26.7 | Repair roadway damaged by slide material | About 14 miles west of Happy Camp at 1.1 miles East of Beck Ranch Road | 11/30/2016 | 1 (07/14/2016) | Details CEM-3701 Report |
| 211129 | Project ID: 211129 DEA: 010F9504 | 01-MEN,MEN-1-0./55.0, 0-55 | Remove and dispose of hazard trees | On Route 1 from the Sonoma/Mendocino County line to Caspar Vista Point | 12/21/2020 | 1 (01/03/2017) | Details CEM-3701 Report |
| 211130 | Project ID: 211130 DEA: 074X8004 | 07-VEN-101,1-32.2/34.8,21.5/23.3, VAR | Repair fire damage and protect highways from fire debris flow from Solimar Fire | Route 101 and Route 1 from 0.7 mile north of West Main St Undercrossing to 0.1 mile s=north of Dulah Road Undercrossing | 07/05/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 211131 | Project ID: 211131 DEA: 060V0404 | 06-KER,KER/KIN-5-82.9/85.75/0.0,9.0, VAR | Slab Replacements | In Kern /Kings County near Kettleman City from 9.9 miles N of the Rte 5/46 Jct to 7.6 miles S of the Rte 5/41 Jct. | 04/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211132 | Project ID: 211132 Permit Numbers: 10156MC0300 | 10-SJ-580-13.4 | Install new traffic signals at Interstate 580/Patterson Pass Road Intersection and Interstate 580/Mountain House Parkway intersection in the City of Tracy. Work includes right turn lane and approach taper at I-580/Patterson Pass Road eastbound onramp and shoulder widening on I-580/Mountain House Pa | SR 580, Tracy | 1 (01/22/2016) | Details CEM-3701 Report |
