Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8181-8190 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210160 | Project ID: 210160 DEA: 101E2204 EFIS: 1015000011 COOP: 10439 | 10-SJ-580-13.3/13.8 | Widen existing road under I-580 to accommodate ramp widening and additional left turn lanes . Proposes to replace existing two lane bridge over the adjacent California Aqueduct on the east side of the Interchange and add two additional lanes | Between I-580 and Old Schulte Road | 2 (01/30/2015) | Details CEM-3701 Report | |
| 210133 | Project ID: 210133 DEA: 120P2404 EFIS: 1215000055 | 12-ORA-5,005-15.89, 15.9 | Repair failed and collapsed roadway slope embankment and remove standing rainwater | between Oso Parkway and La Paz Road | 09/09/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 210077 | Project ID: 210077 DEA: 043G9204 EFIS: 0414000507 COOP: 042565 | 04-ALA-880-9.5/10.0 | Conversion of HOV Lanes to Express Lanes on I-880 ; Installation of the necessary Backhaul Communicaiton Network from Rte 237 to Hegenberger Road | Between Rte 237 and Lewelling Road and I-880 SB between Rte 237 and Hegenberger Road. | 02/10/2021 | 2 (09/20/2017) | Details CEM-3701 Report |
| 4222 | Project ID: 4222 DEA: 073P2304 EFIS: 0700020011 | 07-LA-405-21.6 | INSTALLATION OF CHAIN LINK RAILING ON TYPE 28 CONCRETE BARRIER AND CHEVRON SIGNS WITH J POSTS ON THE RIGHTHAND SIDE OF THE FREEWAY CONNECTOR | BETWEEN SOUTHBOUND LA 405 TO EASTBOUND LA 105 IN LOS ANGELES COUNTY | 1 (12/14/2012) | Details CEM-3701 Report | |
| 6408 | Project ID: 6408 Permit Numbers: 1204NMC0530 | 12-ORA-133-4.2-8.1 | Reduce and re-contour two existing stockpiles (Sta 399+25 to 402+30 and Sta 475+80 to 486+25)along the median of Laguna Canyon Rd between SR-73 and I-405. This item will remove approximately 29,650 CY of soil. 2. Remove pile of boulders at Median Stockpile | Between SR-73 and I-405 | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 208933 | Project ID: 208933 DEA: 042G5104 EFIS: 0412000203 COOP: 042495 | 04-CC-4,160- | Constructor a freeway to freeway connector in each direction | Between State Route (SR) 4 and the SR 160 in Antioch | 05/07/2019 | 2 (08/21/2013) | Details CEM-3701 Report |
| 6751 | Project ID: 6751 DEA: 120K3004 EFIS: 1200000338 MINOR: 12A1270 | 12-ORA-5-7.4/8.0 | Establish Existing Planting and Additional Planting | Between Stonehill Drive and La Novia Avenue | 09/30/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 214831 | Project ID: 214831 Permit Numbers: 08196MC1160 08206RT1092 | 08-SBD-83-2.42 | Enter onto State Route 83 (SR-83) right-of-way at Bickmore Avenue in the City of Chino, to perform street improvement including street widening, addition of left and right turn lanes, striping and crosswalks, ADA ramp modifications, traffic signal modifications and storm drain upsizing, as per plan | Bickmore/ Euclid, Chino | 06/23/2021 | 1 (09/21/2020) | Details CEM-3701 Report |
| 4976 | Project ID: 4976 DEA: 080J5604 | 08-SBD-173-10.8 | EMERGENCY REPAIRS TO BIG PINE CREEK BRIDGE | BIG PINE CREEK BRIDGE ON SR 173 | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 215541 | Project ID: 215541 DEA: 051N4104 EFIS: 0521000015 | 05-MON-1-30.1, 27.2/27.6, 29.6/36.8, 27.2/27.6/36.8, 27.2/27.6, 29.6, 36.8 | Replace culvert-Repair roadway washout, remove and dispose of debris flow materials, unplug and repair culverts, repair other rain related damage, provide temporary traffic control | Big Sur coast, Rat Creek | 09/02/2022 | 1 (03/12/2021) | Details CEM-3701 Report |
