Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8171-8180 of 18865 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211084 | Project ID: 211084 DEA: 030G0204 EFIS: 0314000026 | 03-BUT,COL,YUB-5,20,45,70,149-VAR | PLACE POLYESTER CONCRETE OVERLAY | IN BUTTE, COLUSA AND YUBA COUNTIES AT VARIOUS LOCATIONS | 10/28/2016 | 1 (01/20/2016) | Details CEM-3701 Report |
| 211085 | Project ID: 211085 DEA: 030G3704 | 03-ED-50-58.0/67.6 | BONDED WEARING COURSE-GAP GRADED OVERLAY | BONDED WEARING COURSE-GAP GRADED OVERLAY | 11/30/2017 | 1 (01/20/2016) | Details CEM-3701 Report |
| 211105 | Project ID: 211105 DEA: 042G4524 EFIS: 0414000248 | 04-CC-680-22.2/23.9 | CONCRETE BARRIER TRANSITIONS AND MGS | IN CONTRA COSTA COUNTY ON ROUTE 680AT VARIOUS LOCATIONS BETWEEN EAST MARTINEZ UNDERPASS AND 0.2 MILE SOUTH OF MARIN VISTA AVENUE | 04/14/2021 | 1 (04/25/2016) | Details CEM-3701 Report |
| 211086 | Project ID: 211086 DEA: 050T6304 EFIS: 0500020029 | 05-SB-101-45.6/46.4 | REALIGN CURVE ON EXISTING HIGHWAY. | IN SANTA BARBARA COUNTY NEARGAVIOTA FROM 0.7 MILE NORTH OF BECKSTEAD OVERCROSSING TO 0.8 MILE SOUTH OF GAVIOTA TUNNEL | 08/13/2018 | 1 (04/01/2016) | Details CEM-3701 Report |
| 211087 | Project ID: 211087 DEA: 051G6704 EFIS: 0515000060 | 05-MON-1-40.8/62.5 | COLD PLANE ROADWAY AND RESURFACE ROADWAY WITH HMA (TYPE A) | IN MONTEREY COUNTY ABOUT 10 MILES SOUTH OF CARMEL AT VARIOUS LOCATIONS FROM 1 MILE NORTH OF TORRE CANYON BRIDGE TO 0.5 MILE SOUTH OF GARRAPATA CREEK BRIDGE | 01/04/2018 | 1 (12/29/2017) | Details CEM-3701 Report |
| 211106 | Project ID: 211106 DEA: 081C7104 | 08-SBD-10-12.0/12.8 | MODIFY EXISTING DRAINAGE SYSTEM | MODIFY EXISTING DRAINAGE SYSTEM | 1 (06/24/2021) | Details CEM-3701 Report | |
| 211088 | Project ID: 211088 DEA: 081C4604 | 08-RIV-111-T50.0/56.2 | SLURRY SEAL AND LOCALIZED DIGOUTS | SLURRY SEAL AND LOCALIZED DIGOUTS | 08/04/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 211099 | Project ID: 211099 DEA: 081F4604 EFIS: 0814000228 | 08-SBD-330-R29.0/44.1 | REHABILITATE PAVEMENT | REHABILITATE PAVEMENT | 05/10/2017 | 1 (06/02/2016) | Details CEM-3701 Report |
| 211089 | Project ID: 211089 DEA: 081F4804 EFIS: 0814000231 | 08-RIV,SBD-74,111,18and38-Various | INSTALL APS PUSH BUTTONS AND COUNT DOWN PEDESTRIAN SIGNALS | 04/11/2017 | 1 (07/29/2016) | Details CEM-3701 Report | |
| 211090 | Project ID: 211090 DEA: 081F5204 EFIS: 0814000236 | 08-SBD-40-0.0/R10.0 | PAVEMENT PRESERVATION TREATMENT | PAVEMENT PRESERVATION TREATMENT | 11/29/2016 | 1 (09/21/2016) | Details CEM-3701 Report |
